BREAKDOWN OF UNIT PRICE
Item:071203. Formwork (Steel)-Foundation Beam
Basis:80sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
60.000
rft
2.70
162.00
Sub-Total(D1)
162.00
21.80
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 30 times
88.849
kg
2.33
207.02
FI Bar-use 30 times
30.914
kg
2.33
72.03
MS Sheet/ Plate-use 30 ti
93.164
kg
2.56
238.50
Sub-Total(F2)
517.55
69.64
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 30t
80.000
sft
3.00
240.00
Fitting-steel shutter
80.000
sft
18.00
1440.00
Sub-Total(L2)
1680.00
226.04
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nut-bolt, J-hook-use 30 t
2.000
kg
5.33
10.66
Hessain for water-tight
80.000
sft
1.50
120.00
Curing for 28 days
105.000
sft
4.58
480.90
Cost for support-GB
1.000
LS
50.00
50.00
Sub-Total(M1)
661.56
89.01
Total(1)
406.49
Add over head on Total(1)
3.5 %
14.23
Add Profit on Total(1)
10.0 %
40.65
Total(2)
54.88
Add VAT on Unit Price
5.5 %
3.19
Unit Price
58.07
Say
58
per sqm