BREAKDOWN OF UNIT PRICE
Item:071202. Formwork (Steel)-Mat/ Raft
Basis:12sft
D1.Prop/Pipe/I-sec/Box
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Pipe-38mm-use 50 time
6.000
rft
2.70
16.20
Sub-Total(D1)
16.20
14.53
F2.Steel-MS/ SS
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Angle use 30 times
13.669
kg
2.33
31.85
FI Bar-use 30 times
3.055
kg
2.33
7.12
MS Sheet/ Plate-use 30 ti
13.973
kg
2.56
35.77
MS Angle use 50 times
4.882
kg
1.35
6.59
Sub-Total(F2)
81.33
72.95
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Fabricat Shutter-use 30t
12.000
sft
3.00
36.00
Fitting-steel shutter
12.000
sft
18.00
216.00
Sub-Total(L2)
252.00
226.04
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nut-bolt, J-hook-use 30 t
1.000
kg
5.33
5.33
Hessain for water-tight
12.000
sft
1.50
18.00
Curing for 28 days
34.500
sft
4.58
158.01
Sub-Total(M1)
181.34
162.66
Total(1)
476.19
Add over head on Total(1)
3.5 %
16.67
Add Profit on Total(1)
10.0 %
47.62
Total(2)
64.29
Add VAT on Unit Price
5.5 %
3.74
Unit Price
68.03
Say
68
per sqm