BREAKDOWN OF UNIT PRICE
Item:0711021. RCC-RMC-with pump-5th-14th Floor
Basis:100cft
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Hire-operat cost-Pump
7.521
cft
5.83
43.85
Sub-Total(E1)
43.85
15.48
Total(1)
15.48
Add over head on Total(1)
3.5 %
0.54
Add Profit on Total(1)
10.0 %
1.55
Total(2)
2.09
Add VAT on Unit Price
5.5 %
0.12
Unit Price
2.21
Say
2
per cum