BREAKDOWN OF UNIT PRICE
Item:070804. Ready Mix RCC-50Mpa-Found to 4th
Basis:100cft
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
28.300
bag
440.00
12452.00
Sub-Total(A2)
12452.00
4397.42
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Stone chips-19mm crushed
76.400
cft
218.04
16658.26
Admix-water reduc-high-G
11.300
kg
140.00
1582.00
Admix-Silica-High Streng
71.000
kg
80.00
5680.00
Sub-Total(A3)
23920.26
8447.44
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.2.2)
38.200
cft
53.80
2055.16
Sub-Total(A4)
2055.16
725.78
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
RMC Production cost
100.000
cft
11.61
1161.00
Sub-Total(E1)
1161.00
410.01
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Skilled Labour
0.300
No.
600.00
180.00
Head Mason
0.100
No.
800.00
80.00
Sub-Total(L1)
260.00
91.82
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
14169.58
Add over head on Total(1)
3.5 %
495.94
Add Profit on Total(1)
10.0 %
1416.96
Total(2)
1912.89
Add VAT on Unit Price
5.5 %
111.33
Unit Price
2024.23
Say
2024
per cum