BREAKDOWN OF UNIT PRICE
Item:070802. Ready Mix RCC-32Mpa-Found to 4th
Basis:100cft
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
25.250
bag
440.00
11110.00
Sub-Total(A2)
11110.00
3923.50
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Stone chips-19mm crushed
80.000
cft
218.04
17443.20
Admix-water reduc-high-G
10.000
kg
140.00
1400.00
Sub-Total(A3)
18843.20
6654.48
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.2.2)
40.000
cft
53.80
2152.00
Sub-Total(A4)
2152.00
759.98
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
RMC Production cost
100.000
cft
11.61
1161.00
Sub-Total(E1)
1161.00
410.01
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Skilled Labour
0.300
No.
600.00
180.00
Head Mason
0.100
No.
800.00
80.00
Sub-Total(L1)
260.00
91.82
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
11936.89
Add over head on Total(1)
3.5 %
417.79
Add Profit on Total(1)
10.0 %
1193.69
Total(2)
1611.48
Add VAT on Unit Price
5.5 %
93.79
Unit Price
1705.27
Say
1705
per cum