BREAKDOWN OF UNIT PRICE
Item:070801. Ready Mix RCC-25Mpa-Found to 4th
Basis:100cft
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
22.000
bag
440.00
9680.00
Sub-Total(A2)
9680.00
3418.49
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Stone chips-19mm crushed
83.000
cft
218.04
18097.32
Admix-water reduc-high-G
8.700
kg
140.00
1218.00
Sub-Total(A3)
19315.32
6821.21
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.2.2)
41.500
cft
53.80
2232.70
Sub-Total(A4)
2232.70
788.48
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
RMC Production cost
100.000
cft
11.61
1161.00
Sub-Total(E1)
1161.00
410.01
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Skilled Labour
0.300
No.
600.00
180.00
Head Mason
0.100
No.
800.00
80.00
Sub-Total(L1)
260.00
91.82
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
11627.12
Add over head on Total(1)
3.5 %
406.95
Add Profit on Total(1)
10.0 %
1162.71
Total(2)
1569.66
Add VAT on Unit Price
5.5 %
91.36
Unit Price
1661.02
Say
1661
per cum