BREAKDOWN OF UNIT PRICE
Item:070701. Batching Plant RCC-25Mpa-upto 4th
Basis:100cft
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
22.000
bag
440.00
9680.00
Sub-Total(A2)
9680.00
3418.49
A3.Stone/ Mosaic/ Admix
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Stone chips-19mm crushed
83.000
cft
218.04
18097.32
Admix-water reduc-high-G
8.700
kg
140.00
1218.00
Sub-Total(A3)
19315.32
6821.21
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.2.2)
41.500
cft
53.80
2232.70
Sub-Total(A4)
2232.70
788.48
E1.Equipment/ Scaffoldi
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Hire-operat cost-BatchPla
100.000
cft
7.73
773.00
Hire-operat cost-Payloadr
100.000
cft
3.71
371.00
Hire-operat cost-Pump
100.000
cft
5.83
583.00
Hire-operat cost-TransitM
100.000
cft
4.05
405.00
BatchPlant Generator Cost
100.000
cft
3.00
300.00
Batching Plant Fuel cost
100.000
cft
4.00
400.00
Sub-Total(E1)
2832.00
1000.12
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Skilled Labour
0.300
No.
600.00
180.00
Head Mason
0.100
No.
800.00
80.00
Sub-Total(L1)
260.00
91.82
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
12217.23
Add over head on Total(1)
3.5 %
427.60
Add Profit on Total(1)
10.0 %
1221.72
Total(2)
1649.33
Add VAT on Unit Price
5.5 %
95.99
Unit Price
1745.32
Say
1745
per cum