BREAKDOWN OF UNIT PRICE
Item:030501. CC (1:2:4)-L.Sand,Brickchip-Found
Basis:100cft
A1.Brick/ Blocks
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
765.000
Nos.
10.00
7650.00
Sub-Total(A1)
7650.00
2701.60
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-I, 52.5-OPC
18.000
bag
440.00
7920.00
Sub-Total(A2)
7920.00
2796.95
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.1.2)
45.000
cft
19.00
855.00
Sub-Total(A4)
855.00
301.94
F1.Timber/ Board
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Wood for Shutter use 6-ti
3.860
cft
91.67
353.85
Sub-Total(F1)
353.85
124.96
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Breaking 20mm brick-chips
90.000
cft
9.70
873.00
Side Shuttering-wooden
40.000
sft
9.00
360.00
Laying/ placing concrete
100.000
cft
19.90
1990.00
Sub-Total(L2)
3223.00
1138.20
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Curing for 7 days
1.000
LS
229.17
229.17
Sub-Total(M1)
229.17
80.93
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
7241.70
Add over head on Total(1)
3.5 %
253.46
Add Profit on Total(1)
10.0 %
724.17
Total(2)
977.63
Add VAT on Unit Price
5.5 %
56.90
Unit Price
1034.53
Say
1035
per cum