BREAKDOWN OF UNIT PRICE
Item:030401. CC (1:3:6)-L.Sand,Brickchip-Found
Basis:100cft
A1.Brick/ Blocks
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
765.000
Nos.
10.00
7650.00
Sub-Total(A1)
7650.00
2701.60
A2.Cement
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement: CEM-II/A,52.5-PCC
13.000
bag
405.00
5265.00
Sub-Total(A2)
5265.00
1859.33
A4.Earth/ Sand
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand (F.M.1.2)
45.000
cft
19.00
855.00
Sub-Total(A4)
855.00
301.94
F1.Timber/ Board
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Wood for Shutter use 6-ti
3.860
cft
91.67
353.85
Sub-Total(F1)
353.85
124.96
L2.Work Rate-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Breaking 20mm brick-chips
90.000
cft
9.70
873.00
Side Shuttering-wooden
65.000
sft
9.00
585.00
Laying/ placing concrete
100.000
cft
19.90
1990.00
Sub-Total(L2)
3448.00
1217.66
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Curing for 7 days
1.000
LS
229.17
229.17
Sub-Total(M1)
229.17
80.93
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
0.500
No.
550.00
275.00
Sub-Total(M2)
275.00
97.12
Total(1)
6383.55
Add over head on Total(1)
3.5 %
223.42
Add Profit on Total(1)
10.0 %
638.35
Total(2)
861.78
Add VAT on Unit Price
5.5 %
50.16
Unit Price
911.94
Say
912
per cum