BREAKDOWN OF UNIT PRICE
Item:0205. Palasiding drum sheet excl post
Basis:150sft
F1.Timber/ Board
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Borak Bamboo avg75mm
60.000
rft
13.50
810.00
Sub-Total(F1)
810.00
58.13
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ordinary Labour
2.000
No.
550.00
1100.00
Skilled Labour
1.000
No.
600.00
600.00
Sub-Total(L1)
1700.00
121.99
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Nail and wires, gazals
5.000
kg
70.00
350.00
Bitumin Drum used, empty
12.000
each
250.00
3000.00
Sub-Total(M1)
3350.00
240.40
M2.Local Carriage,Sundr
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Local Carriage-(Labour)
2.000
No.
550.00
1100.00
Sub-Total(M2)
1100.00
78.94
Total(1)
499.45
Add over head on Total(1)
3.5 %
17.48
Add Profit on Total(1)
10.0 %
49.94
Total(2)
67.43
Add VAT on Unit Price
5.5 %
3.92
Unit Price
71.35
Say
71
per sqm