BREAKDOWN OF UNIT PRICE
Item:010201. As-built drawing-A2 size-3 sets
Basis:1no.
M1.Miscelleneous
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Survey, study by Engr/Arc
7.000
day
1800.00
12600.00
Inventory listing
3.000
day
1200.00
3600.00
Autocad operator
3.000
day
1200.00
3600.00
Checking by Arch/ Engr
1.000
day
2666.67
2666.67
As-built drawing-sundries
1.000
LS
561.67
561.67
Sub-Total(M1)
23028.34
23028.34
Total(1)
23028.34
Add over head on Total(1)
3.5 %
805.99
Add Profit on Total(1)
10.0 %
2302.83
Total(2)
3108.83
Add VAT on Unit Price
5.5 %
180.94
Unit Price
3289.76
Say
3290
per tend