M Prefabricated Steel Structure
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
M01A1 H.Plie Connection 300x300x10x15 Ton
89090.00
114473
M01A2 H.Pile Removing-300x300x10x15 Ton
18000.00
23128
M01B1 Wale Instalation-300x300x10x15 Ton
89090.00
114473
M01B2 Wale Connection-300x300x10x15 Ton
89090.00
114473
M01C1 Strut Installation-300x300x10x15 Ton
89090.00
114473
M01C2 Strut Conection-300x300x10x15 Ton
89090.00
114473
M01C3 Pieace Bracket Inst-300x300x10x15 Ton
89090.00
114473
M01D1 H.Beam Installation-300x200x09x16 Ton
89090.00
114473
M01D2 H.Beam Connection-300x200x09x16 Ton
89090.00
114473
M01E1 Angle Installation-100x100x10 Ton
89090.00
114473
M01E2 Angle Bracket Installa-100x100x10 Ton
89090.00
114473
M02A Prefabricated Frame Structure Ton
109100.00
140184
M02A1 Hot Rolled JIS I/H (MS490, 325Mpa Ton
163620.00
210238
M02A2 Hot Roll JIS I/H(MS490,325Mpa-Col Ton
0.00
0
M02A3 Build-up Steel Section-Grade 50 Ton
130430.00
167592
M02B Deck Plate-0.7mm Thick Sqm
1089.00
1399
M02B1 Shear Stud Pcs
72.00
93
M02C Steel Plate Ton
109100.00
140184
M02C1 Base Plate n Joint Plate Ton
133620.00
171691
M02D HTB Ton
198310.00
254812
M02D1 Galvanized Nut Bolts and Washer Ton
838620.00
1077556
M02E Anchor Rod Ton
838620.00
1077556
M03A MS Angle Flat Bar for Truss/Fence Ton
74250.00
95405
M03B Industrial Profile Sheet-Roof/Fen Sqm
818.00
1051
M03C MS Pipe for Post Ton
3143.00
4038
M03D Buble Insulation Sheet Sqm
283.00
364
M04 Ocean View Convention Center-Slab Sum
999999.99
1284916