ITEM SCHEDULE | ||||
---|---|---|---|---|
Click on Code to see the analysis or Go Home | Profit=10%, Overhead=5%, VAT=5.5% IT=5% | |||
E | Finishing Works | |||
Code | Item | Unit | Cost(Tk.) | Unit Rate(Tk.) |
E01A | Grinding RCC Surface-Vertical | M2 | 161.00 |
207 |
E01B | Grinding RCC Surface-Slab Bot | RM | 30.00 |
39 |
E02A | 250mm Brick Work | M3 | 5958.00 |
7656 |
E02A0 | Brick-work(1:4)-M/c made Brick | Cum | 6810.00 |
8750 |
E02A1 | 250mm Brick Work upto 20-Story | Cum | 5204.00 |
6687 |
E02A2 | 250mm Brick Work-3rd-1st Basement | Cum | 6140.00 |
7889 |
E02A3 | 250mm Brick Work-Gr-4th Floor | Cum | 6316.00 |
8116 |
E02A4 | 250mm Brick Work-5th-9th Floor | Cum | 6669.00 |
8569 |
E02A5 | 250mm Brick Work-10th-11th Floor | Cum | 6846.00 |
8797 |
E02B | 125mm Brick Work | M2 | 827.00 |
1063 |
E02B0 | Brick-work(1:4)-125mm-M/c made Br | Sqm | 929.00 |
1194 |
E02B1 | 125mm Brickwork-Basement | Sqm | 936.00 |
1203 |
E02B2 | 125mm Brickwork-Gr-4th Floor | Sqm | 990.00 |
1272 |
E02B3 | 125mm Brickwork-5th-9th Floor | Sqm | 1044.00 |
1341 |
E02B4 | 125mm Brickwork-10th-11th Floor | Sqm | 1098.00 |
1411 |
E02B5 | 125mm Pointing Brick-work-GF-4F | Sqm | 1118.00 |
1437 |
E02C1 | 200mm Concrete Block-Basement | Sqm | 1769.00 |
2273 |
E02C2 | 200mm Concrete Block-Gr-4th Floor | Sqm | 1823.00 |
2342 |
E02C3 | 200mm Concrete Block-5th-9th Flr | Sqm | 1930.00 |
2480 |
E02C4 | 200mm Concrete Block-10th-11th | Sqm | 1984.00 |
2549 |
E02D1 | Concrete Block Work-200mm Thick | Sqm | 1535.00 |
1972 |
E02D2 | Concrete Block Work-100mm Thick | Sqm | 879.00 |
1129 |
E03 | Plaster | M2 | 157.00 |
202 |
E03A | Plaster on Brick Wall | Sqm | 256.00 |
329 |
E03A1 | Chipping on RCC Surface | Sqm | 86.00 |
111 |
E03A2 | Plaster- Brick Wall-upto 4th Flor | Sqm | 0.00 |
0 |
E03A3 | Plaster-upto 5th Floor | Sqm | 350.00 |
450 |
E03B1 | Plaster on RCC Core | Sqm | 324.00 |
416 |
E03B2 | Plaster on Retaining Wall | Sqm | 243.00 |
312 |
E03B3 | Plaster on RCC Column | Sqm | 324.00 |
416 |
E03B4 | Plaster with Neat Cement Finish | Sqm | 231.00 |
297 |
E03B5 | Water Proofing Liquid Membrane | Sqm | 861.00 |
1106 |
E03B6 | Cement Plaster (1:4)-12mm NCF | Sqm | 324.00 |
416 |
E03B7 | Plaster-RCC Surface-upto 4th Flor | Sqm | 0.00 |
0 |
E03C1 | Ruled Pointing on Brick Wall | Sqm | 0.00 |
0 |
E04A | Wall Tiles-China in Toilet Area | M2 | 2158.00 |
2773 |
E04A1 | Wall Tiles-Toilet-RAK | Sqm | 1069.00 |
1374 |
E04A2 | Wall Tiles-Lift-Local | Sqm | 1211.00 |
1556 |
E04B | Floor Tiles-China in Toilet Area | M2 | 2158.00 |
2773 |
E04B0 | Medium Sand Supply for Tile Work | Cum | 883.00 |
1135 |
E04B1 | Floor Tiles-Local | Sqm | 1803.00 |
2317 |
E04B2 | Stair Tiles-RAK | Sqm | 1189.00 |
1528 |
E04C | Marble Top in Toilet Area | M2 | 13030.00 |
16742 |
E05A | Marble Cladding in Common Area | M2 | 13030.00 |
16742 |
E05B | Floor Marble in Common Area | M2 | 15398.00 |
19785 |
E05C | Zer Floor in Common Stair | M2 | 6997.00 |
8991 |
E06A | Paving Tiles in Basement | M2 | 101.00 |
130 |
E06B | Roof Tiles-MCL-Flower-Red | Sqm | 2360.00 |
3032 |
E07A | Stair Railing-S.S304/Satin | M2 | 356647.00 |
458262 |
E07A1 | SS Stair Railing-2.5mm Thk 37mm D | Sqm | 6997.00 |
8991 |
E07B | Verandah Railing Framing | M2 | 0.00 |
0 |
E07B1 | SS Ver Railing-2.5mm Thk 37mm D | Sqm | 6458.00 |
8298 |
E07C | Stair Hand Rail | RM | 0.00 |
0 |
E07D | Verandah Hand Rail | RM | 0.00 |
0 |
E07E | Stair Nosing | RM | 49.00 |
63 |
E08A1 | Glass Curtain-Low-E-19mm-Printed | M2 | 28202.00 |
36237 |
E08A2 | Glass Curtain-Low-E-19mm-Clear | M2 | 25508.00 |
32776 |
E08B1 | Glass-Print above Door | M2 | 18132.00 |
23298 |
E08B2 | Glass - Clear above Door | M2 | 15386.00 |
19770 |
E08C | Laminated Glass Balustrade | Rm | 13666.00 |
17560 |
E08D1 | Point Fix Glass-Laminated | M2 | 17848.00 |
22933 |
E08D2 | Point Fix Glass-Insulated | M2 | 18810.00 |
24169 |
E08E1 | Glass Spring Door-Clear | M2 | 22569.00 |
28999 |
E08E2 | Glass Spring Door-Print | M2 | 23917.00 |
30731 |
E08E3 | Floor Spring Door | M2 | 21222.00 |
27268 |
E08F1 | Glass Automatic Door | M2 | 53954.00 |
69326 |
E08F2 | Glass Automatic Door-Indoor | M2 | 48781.00 |
62679 |
E08G | Glass Swing Door | M2 | 28800.00 |
37006 |
E08H1 | AlumCurtain Wall-6mm Reflectd Gls | Sqm | 6458.00 |
8298 |
E08H2 | AlumCompositePanel(Alucobond)-3mm | Sqm | 3767.00 |
4840 |
E08J1 | AlumPartion,Window-75mm,5mm Glass | Sqm | 2368.00 |
3043 |
E08J2 | Alumimium Swing Door-101.6mm | Sqm | 5920.00 |
7607 |
E09A | False Ceiling in Toilet Area | Flor | 60000.00 |
77095 |
E09B | False Ceiling in Common Area | Flor | 25000.00 |
32123 |
E09C | Perforated Metalic False Ceiling | Sqm | 2153.00 |
2766 |
E10A | Stair Paint-Plastic Emulsion | Flor | 38000.00 |
48827 |
E10A1 | Plastic Emulsion Paint | Sqm | 276.00 |
355 |
E10A2 | Stair Paint-Slate Finish | Flor | 6000.00 |
7709 |
E10A3 | Weather Coat Paint | Sqm | 231.00 |
297 |
E10A4 | Textured Paint | Sqm | 542.00 |
696 |
E10A5 | Synthatic Enamel Paint | Sqm | 52.00 |
67 |
E10C | French Polishing Door Frame,shutt | Sqm | 861.00 |
1106 |
E11A | Pastic Partition for Toilet-18mm | Sqm | 2691.00 |
3458 |
E12A | Door Frame-Malaysian-1000x2100 | Nos. | 12208.00 |
15686 |
E12A1 | Door Frame-Chittagong Teak | Cum | 137964.00 |
177272 |
E12B | Door Shutter-Malaysian-1000x2100 | Nos. | 11723.00 |
15063 |
E12C | Door Closure-Heavy Type | Nos. | 10500.00 |
13492 |
E12D | Door Lock-Heavy Type | Nos. | 10800.00 |
13877 |
E13 | Podema Installation | Sqm | 0.00 |
0 |
E14 | Glass Work-Floorwise | Sqm | 8073.00 |
10373 |
E15 | Finhing Work-Floorwise | Sqm | 7535.00 |
9682 |
E16 | Interior and Exterior Finishing | Sqm | 1739.00 |
2234 |
E17 | MS Grill | Sqm | 8.00 |
10 |
E17A | CI Boundary Gill | Sqm | 0.00 |
0 |
E17B | MS Window | Sqm | 2422.00 |
3112 |
E18A | SC-Custom Duty and LC | Sum | 999999.99 |
1284916 |
E18B | SC-Glass Fitting | Sum | 999999.99 |
1284916 |