ITEM SCHEDULE
Click on Code to see the analysis or Go Home Profit=10%, Overhead=5%, VAT=5.5% IT=5%
B Substructure
Code Item Unit Cost(Tk.) Unit Rate(Tk.)
B00A Providing Piling Point each
500.00
642
B01 Misc. Work for Substructure-1 L.S.
173507.00
222942
B01A Shore Piling-Boring,casting-600mm M
886.00
1138
B01A0 In-situ Piling Rig Mobilization set
200000.00
256983
B01A1 Pile Boring-1500 mm dia Rm
15337.00
19707
B01A2 Pile Boring-1200 mm dia Rm
9693.00
12455
B01A3 Pile Boring-1000 mm dia Rm
7799.00
10021
B01A4 Mud Removal-Seal Pile Cum
960.00
1234
B01A5 Mud Removal-Shore/ Seal Pile Cum
960.00
1234
B01A6 Pile Boring-Seal Pile-500mm dia Rm
6201.00
7968
B01A7 Trial Shore Piile-1000mm dia Bori no.
704066.00
904666
B01A8 Obstacle Removal for Casing Drivi Rm
8934.00
11479
B01A9 Steel Mud Tank no.
175000.00
224860
B01AA Shore Pile-Temporary Casing Drive Rm
8905.00
11442
B01AB Shore Pile-Excavation-BackFilling Cum
1766.00
2269
B01AC Shore Pile-Salvage Removal LS
500000.00
642458
B01AD Shore Pile-Dewatering Day
4480.00
5756
B01AE Shore-Pile-Air Supply Day
3500.00
4497
B01AF In-situ Piling Rig Hire Charge Mont
50000.00
64246
B01AG Shore Pile-Additional1 LS
999999.99
1284916
B01AH In-situ Pile Boring-500mm dia RM
869.00
1117
B01AI In-situ Pile Concrete-3500 psi cum
10197.00
13102
B01B RCC (1:1.5:3) in Pile excl reinf M3
7687.00
9877
B01B0 Shore/ Seal Pile Concreting Cum
4828.00
6204
B01B1 Concrete C21 in Service Pile M3
9041.00
11617
B01B2 Concrete C21 in Shore Pile Cum
9041.00
11617
B01B3 Concrete-3500psi-Shore Pile Cum
9888.00
12705
B01B4 Concrete-2500psi-Seal Pile Cum
8122.00
10436
B01B5 Concrete-3500psi-King Post Pile Cum
9005.00
11571
B01B6 Concrete-4000psi-King Post Pile Cum
9182.00
11798
B01B7 Kingpost Pile Concreting Cum
23850.00
30645
B01B8 Concrete-4000psi-Tie Beam-Wall Cum
10771.00
13840
B01B9 RCC(1:1.5:3)-Brickchip-Sand-FM1.2 Cum
6822.00
8766
B01BA Concrete-4000psi-King Post Cum
14010.00
18002
B01BB RCC(1:2:4)-Brickchip-L:S.S=1:1-GL Cum
7194.00
9244
B01BC RCC(1:1.25:2.5)-Sub-structure Cum
10983.00
14112
B01BD RCC(1:1.25:2.5)-Super-structure Cum
11866.00
15247
B01BE RCC(1:2:4)-Brckchp,Local Sand Cum
7507.00
9646
B01BF RCC (1:1.5:3) in Pile, Stone-chip Cum
11488.00
14761
B01C Re-bar 60 Grade-Shore Pile TON
61950.00
79601
B01C0 MS Deform Bar-Grade-400 Ton
69940.00
89867
B01C1 Point Welding-Service Pile Poin
3.00
4
B01C2 Welded Splice-Service Pile inch
6.00
8
B01C3 Re-bar 60 Grade-Service Pile Ton
78425.00
100770
B01C4 Point Welding-Shore Pile Poin
3.00
4
B01C5 Welded Splice-Shore Pile inch
6.00
8
B01C6 Re-bar 72.5 Grade- Shore Pile Ton
61950.00
79601
B01C7 Spacer Insatallation-Service Pile No.
15.00
19
B01C8 Spacer Insatallation-Shore Pile No.
15.00
19
B01C9 Re-bar Grade-400-Shore Pile Ton
2751.00
3535
B01CA Re-bar Fabricating-Shore Pile Ton
18960.00
24362
B01CB Re-bar 72.5 Grade- King Post Ton
61950.00
79601
B01CC Re-bar Fabricating-King Post Ton
18960.00
24362
B01CD Re-bar Joint with Epoxy Each
1000.00
1285
B01CE Re-bar 72.5 Grade- Tie Beam-Wall Ton
61950.00
79601
B01CF Re-bar Fabricating-Tie Beam-Wall Ton
18960.00
24362
B01CG Spacer CC for Pile Reinforcement no.
19.00
24
B01CH MS Deform Bar-Grade-400 Supply Ton
55000.00
70670
B01CJ Re-bar 72.5 Grade-Tie Beam-Wall Ton
75910.00
97538
B01CK Re-bar 72.5 Grade - King Post Ton
80910.00
103963
B01CL Re-bar 72.5 Grade- In-situ Pile ton
0.00
0
B01CM In-situ Pile Point Welding poin
3.00
4
B01CN In-situ Pile-Welded Spilce-Joint inch
12.00
15
B01CO In-situ Pile Mud Removal cum
510.00
655
B02A Grating-CP-100 mm dia NO.
125.00
161
B02B Sand Filling M3
1218.00
1565
B02B1 Sand Filling upto GF M3
1395.00
1792
B02B2 Earth Back Filling Cum
530.00
681
B02B3 Sand Filling with Comapction Cum
1218.00
1565
B02B4 Sand Filling Cum
1001.00
1286
B02B5 Working Bed Preparation Sqm
1500.00
1927
B02B6 Cement Concreting Sqm
1749.00
2247
B02B7 Sand Filling (FM=0.5-0.8) Cum
1052.00
1352
B02B8 Earth Filling with Earth Availabl Cum
210.00
270
B02C Pile Head Breaking NO.
200.00
257
B02C0 Pile Head Breaking-2 Cum
0.00
0
B02C1 Pile Head Breaking by Power Hammr Cum
8829.00
11345
B02C2 Pile Head Manual Finishing Each
105945.00
136130
B02C3 Pile Re-bar Cleaning, Straighteni Each
3000.00
3855
B02C4 Pile Integrity Test Each
3000.00
3855
B02D RCC(1:1.5:3) in Perimeter Beam M3
8091.00
10396
B02E Re-bar 60 Grade-Perimeter TON
61950.00
79601
B02F Static Load Test-30MN Load No.
999999.99
1284916
B02F1 High Strain Dynamic Test-1500mm No.
999999.99
1284916
B03A Earth Excavation upto 5m depth m3
530.00
681
B03A0 Earthwork in Excavation-Layout Sqm
21.00
27
B03A1 Earth Work in Excavation Cum
242.00
311
B03B Earth Excavation from 5m to 10m M3
706.00
907
B03C Earth Excavation from 10m to 15m M3
883.00
1135
B03D Earth Excavation beyond 10m M3
565.00
726
B03E Excavation above GF M3
124.00
159
B03F Excavation upto 18m Depth m3
514.00
660
B04A Bracing-Driving MS Pipe TON
61700.00
79279
B04B Bracing-MS Joist TON
129000.00
165754
B04C Bracing-MS Plate TON
115000.00
147765
B04C1 Safety Railing, Drain n Pavemen Rm
4614.00
5929
B04D1 Bracing-Anchor Bolt-1/2"d, 6"L NOS
147.00
189
B04D2 Bracing-Anchor Bolt-1/2"d, 7"L NOS
58.00
75
B04D3 Bracing-Anchor Bolt-1/2"d, 8"L NOS
60.00
77
B04D4 Bracing-Rowel Bolt-4"Long NOS
33.00
42
B04E Bracing-Remove Joist,Plate TON
18000.00
23128
B05A Two Layer Polythene M2
2.00
3
B05A1 Single Layer Polythene 0.2mm thic M2
68.00
87
B05A2 Single Layer Polythene Sqm
35.00
45
B05B Lean Concrete-80 mm Thick M3
7346.00
9439
B05B1 Mass Concrete-C-15 Cum
8052.00
10346
B05B2 Mass Concrete-fc=15 Mpa Cum
8582.00
11027
B05B3 Lean Concrete Cum
8582.00
11027
B05B4 Lean Concrete(1:3:6) Cum
5800.00
7453
B05C Concrete Bonding Chemical L
1600.00
2056
B05D Brick Flat Soling Sqm
439.00
564
B05D1 One Layer Brick Flat Soling Sqm
480.00
617
B05D2 Levelling ad Dressing Sqm
32.00
41
B05E 38mm PatentStone(1:2:4),Stone,S:L Sqm
620.00
797
B05F1 Bitumins Water Proof Membran-Foun Sqm
1294.00
1663
B05F2 Bitumins Water Proof Membran-Roof Sqm
1076.00
1383
B05F3 BituminsWaterProof Membran-Fl-Wa Sqm
1294.00
1663
B06A Concrete-4500 psi-Mat M3
11857.00
15235
B06A0 Concrete-30Mpa-Cap/Footing/Mat Cum
11689.00
15019
B06A1 Concrete-C-25-Mat, Retaining Wall Cum
10453.00
13431
B06A2 Concrete-32Mpa-Mat Cum
11936.00
15337
B06A3 Concrete-32Mpa-Retaining Wall Cum
11601.00
14906
B06A4 Concrete-32Mpa-Wall-Substructure Cum
11601.00
14906
B06A5 Concrete-32Mpa-Slab-Substructure Cum
11733.00
15076
B06A6 Concrete-32Mpa-Beam-Substructure Cum
12131.00
15587
B06A7 Concrete-32Mpa-Stair-Substructure Cum
11601.00
14906
B06A8 Concrete-32Mpa-Colum-Substructure Cum
12131.00
15587
B06A9 Concrete-3500psi-Wall-Substructur Cum
10541.00
13544
B06B Concrete-4500 psi in Basement-3 M3
14119.00
18142
B06B0 Concrete-30Mpa-R,Wall/Col/Star-PL Cum
11954.00
15360
B06B1 Concrete-C-35 in Basement-3 M3
10877.00
13976
B06C Concrete-3500 psi in Basement-2 M3
13059.00
16780
B06D Concrete-4500psi in Basement-2 M3
15133.00
19445
B06E Concrete-3500 psi in Basement-1 M3
14074.00
18084
B06F Concrete-4500psi in Basement-1 M3
14805.00
19023
B06G Concrete-3500psi in GF M3
13746.00
17662
B06H Concrete-C-25-Column, Wall Cum
12713.00
16335
B06J Concrete-C25-Slab, Beam Cum
12537.00
16109
B06K VH-Admixture Sum
145000.00
186313
B07A Re-Bar Grade 60 in Mat TON
61950.00
79601
B07B MS Rod - Grade-60 up to GF TON
61950.00
79601
B07B1 MS Rod-Geade-500W/72.5 Upto GF Ton
74910.00
96253
B07B2 MS Rod-Grade 500W/72.5 -Mat Ton
74910.00
96253
B08A PVC Water Stopper-6" width M
164.00
211
B08A1 PVC Water Stopper-150 mm Fixing M
238.00
306
B08B PVC Water Stopper-8" Width M
246.00
316
B09A Brick Work-125mm Thick M2
821.00
1055
B09A1 Brick Work (1:4)-125mm Thick-PWD M2
902.00
1159
B09B Brick Work-250mm Thick M3
5202.00
6684
B10A Plaster Work-12mm Thick M2
163.00
209
B10B Plaster with NCF M2
68.00
87
B11A Steel Shutter-Mat Sqm
3004.00
3860
B11A0 Formwork Wood-Substructure Sqm
345.00
443
B11A1 Formwork Wood-Mat/Cap/Footing Sqm
473.00
608
B11B Steel Shutter-Retaining Wall Sqm
3470.00
4459
B11C Steel Shutter-Wall-Substructure Sqm
4318.00
5548
B11C0 Steel Shutter-Footing Sqm
1154.00
1483
B11C1 Steel Shutter-Shear Wall-Supply Sqm
4226.00
5430
B11D Steel Shutter-Slab-Substructure Sqm
3554.00
4567
B11E Steel Shutter-Beam-Substructure Sqm
3013.00
3871
B11F Steel Shutter-Stair-Substructure Sqm
3026.00
3888
B11G Steel Round Shutter-king Post Sqm
2886.00
3708
B11H Steel Shutter-Column-Substructure Sqm
3680.00
4728
B11J Column Retrofitting LS
250000.00
321229
B12A Casion Shutter Supply, Driving Sqm
8724.00
11210
B12A1 Cassion Shutter withrwal from bot Sqm
25000.00
32123
B12A2 Cassion-3.000 m dia Driving Rm
82177.00
105591
B12A3 Cassion-3.000 m dia Withdrawl Rm
25348.00
32570
B12A4 Cassion-3.000m-Additional Sum
999999.99
1284916
B12B Sand Lift, remove from Cashion Cum
2495.00
3206
B12B1 RCC Dismantle, remove fm cassion LS
999999.99
1284916
B12B2 Steel Cutting, removal fm cassion LS
999999.99
1284916
B12C Salvage-Joist Cutting, Pile Break LS
999999.99
1284916
B12C1 Salvage-Joist, MS Bar Lift, Remov Ton
10000.00
12849
B12C2 Salvage-Broken Pile Lift/ Remove Cum
3532.00
4538
B12C3 Lifting-Excavataor,Generator, Wel L.S
999999.99
1284916
B12C4 Lifting-Pipe,Billboard,Silo L.S
200000.00
256983
B12C5 Salvaged Equip,Tools Lift removal LS
999999.99
1284916
B12C6 Tie Beam-Earth Removal Cum
1766.00
2269
B12C7 Tie-Beam-Wall-Additional LS
999999.99
1284916
B12C8 Steel Salvage Value Ton
25000.00
32123
B12D Backfill casssion void manually Cum
2000.00
2570
B13A Hire Charge-Crawler Crane-50T-8hr Day
76346.00
98098
B13B Hire Charge-Compressor Day
14134.00
18161
B13C Oxygen Cyl, Light, Mask, Ladder No.
14134.00
18161
B13C1 Air flow, exhaust fan for cassion Day
5000.00
6425
B13C2 Dewatering per Cassion Day
8000.00
10279
B13C3 Dewatering Substructure Day
6865.00
8821
B13D Long Boom Excavator-8 Hour Day
34533.00
44372
B13E Suvey Work with Total station Day
4125.00
5300
B14A Retrofitting 7-Col,1-wall,3-floor LS
999999.99
1284916
B14B Retrofitting Shutter Reparing M2
1092.00
1403
B15 Pile Gap Sealing Work Sqm
3229.00
4149
B16 Hard Pavement with Drain Sqm
2420.00
3109
B17 Safety Railing-1.2m Height Rm
1126.00
1447
B18 Shed with Tripol and Bamboo Sqm
753.00
968