ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
B5 | Labour Finishing | ||
Code | Item | Unit | Rate(Tk.) |
B501 | Grinding Vertical Surface | sft | 15.00 |
B502 | Grinding Slab | rft | 9.00 |
B503 | Brick-work 250mm | cft | 25.00 |
B504 | Brick work 125 mm | sft | 15.00 |
B505 | Plastering | sft | 9.00 |
B506 | Tile fitting | sft | 25.00 |
B507 | Marble fixing | sft | 100.00 |
B508 | Paving Tile Fixing | sft | 25.00 |
B509 | Brick Work-250mm-20story | cft | 30.00 |
B510 | Roof Tiles Fixing | sft | 25.00 |
B511 | Stair Tile Fixing | sft | 35.00 |
B512 | Door Frame Fixing | no. | 500.00 |
B513 | Door Shutter Fixing | sft | 35.00 |
B514 | Plaster -20 Story | sft | 16.50 |
B515 | RCC Chipping | sft | 8.00 |
B516 | French Polishing | sft | 80.00 |
B517 | Plastic Painting-20 Story | sft | 6.50 |
B518 | Door Closure Fitting | no. | 500.00 |
B519 | Door Lock Heavy Duty | no. | 800.00 |
B520 | Cement Finishing | sft | 5.00 |
B521 | Brickwork-250mm-Basement | cft | 30.00 |
B522 | Brickwork-250mm-Gr-4th Fl | cft | 35.00 |
B523 | Brickwork-250mm-5th-9th F | cft | 45.00 |
B524 | Brickwork-250mm-10th-11th | cft | 50.00 |
B525 | Brickwork-125mm-Basemnt | sft | 25.00 |
B526 | Brickwork-125mm-Gr-4th Fl | sft | 30.00 |
B527 | Brickwork-125mm-5th-9th F | sft | 35.00 |
B528 | Brickwork-125mm-10th-11th | sft | 40.00 |
B529 | Blockwork-200-Basement | sft | 35.00 |
B530 | Blockwork-200mm-Gr-4th | sft | 40.00 |
B531 | Blockwork-200mm-5th-9th | sft | 50.00 |
B532 | Blockwork-200mm-10th-11th | sft | 55.00 |
B533 | Zer Floor Fixing | sft | 20.00 |
B534 | Stair Nozing Fixing | rft | 15.00 |
B535 | Stair Railing Fixing | sft | 200.00 |
B536 | Podema installation | sft | 0.00 |
B537 | Fix FramelessGlassCurtain | sft | 650.00 |
B538 | Blockwork-100mm thick | sft | 35.00 |