ITEM RATE
Click on Code to see the Shedule Items or Go Home
B4 Labour SuperStructu
Code Item Unit Rate(Tk.)
B401 Structure at GF sft
109.00
B402 Structure at 1st Floor sft
114.45
B403 Structure at 2nd Floor sft
119.90
B404 Structure at 3rd Floor sft
125.35
B405 Structure at 4th Floor sft
130.80
B406 Structure at 5th Floor sft
136.25
B407 Structure at 6th Floor sft
141.70
B408 Structure at 7th Floor sft
147.15
B409 Structure at 8th Floor sft
152.60
B410 Structure at 9th Floor sft
158.05
B411 Structure at 10th Floor sft
163.50
B412 Structure at 11th Floor sft
168.95
B413 Structure at 12th Floor sft
174.40
B414 Structure at 13th Floor sft
179.85
B415 Structure at 14th Floor sft
340.00
B416 Re-bar unload, carrying ton
150.00
B417 Plaster-12mm-Super sft
5.00
B418 Concreteing-Col,Shear cft
50.00
B419 Concreting-Slab,Beam cft
45.00
B420 Shuttering sft
62.37
B421 Re-bar Work kg
10.39
B422 Ready-mix Concrete-GF-4th cft
50.00
B423 Ready-mix Concret-5th-9th cft
65.00
B424 Ready-mix Concrt-10th-11t cft
75.00
B425 Shuttering-Gr-4th Floor sft
45.00
B426 Shuttering-5th-9th Floor sft
55.00
B427 Shuttering-10h-11th Floor sft
60.00
B428 Re-bar Fabrication-GF-11t kg
15.00
B429 Structure at 15th Floor sft
350.00
B430 Structure at 16th Floor sft
360.00
B431 Structure at 17th Floor sft
370.00
B432 Structure at 18th Floor sft
380.00
B433 Structure at 19th Floor sft
390.00
B434 Dismantling RCC sum
99999.99
B435 Concreting Superstructure cft
19.00
B436 Re-bar fabrication-Supers kg
8.60
B437 Shuttering-Superstructure sft
42.00
B438 RCC Work-Superstructure cft
50.00
B439 Re-bar Epoxy Work no.
25.00