ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
B4 | Labour SuperStructu | ||
Code | Item | Unit | Rate(Tk.) |
B401 | Structure at GF | sft | 109.00 |
B402 | Structure at 1st Floor | sft | 114.45 |
B403 | Structure at 2nd Floor | sft | 119.90 |
B404 | Structure at 3rd Floor | sft | 125.35 |
B405 | Structure at 4th Floor | sft | 130.80 |
B406 | Structure at 5th Floor | sft | 136.25 |
B407 | Structure at 6th Floor | sft | 141.70 |
B408 | Structure at 7th Floor | sft | 147.15 |
B409 | Structure at 8th Floor | sft | 152.60 |
B410 | Structure at 9th Floor | sft | 158.05 |
B411 | Structure at 10th Floor | sft | 163.50 |
B412 | Structure at 11th Floor | sft | 168.95 |
B413 | Structure at 12th Floor | sft | 174.40 |
B414 | Structure at 13th Floor | sft | 179.85 |
B415 | Structure at 14th Floor | sft | 340.00 |
B416 | Re-bar unload, carrying | ton | 150.00 |
B417 | Plaster-12mm-Super | sft | 5.00 |
B418 | Concreteing-Col,Shear | cft | 50.00 |
B419 | Concreting-Slab,Beam | cft | 45.00 |
B420 | Shuttering | sft | 62.37 |
B421 | Re-bar Work | kg | 10.39 |
B422 | Ready-mix Concrete-GF-4th | cft | 50.00 |
B423 | Ready-mix Concret-5th-9th | cft | 65.00 |
B424 | Ready-mix Concrt-10th-11t | cft | 75.00 |
B425 | Shuttering-Gr-4th Floor | sft | 45.00 |
B426 | Shuttering-5th-9th Floor | sft | 55.00 |
B427 | Shuttering-10h-11th Floor | sft | 60.00 |
B428 | Re-bar Fabrication-GF-11t | kg | 15.00 |
B429 | Structure at 15th Floor | sft | 350.00 |
B430 | Structure at 16th Floor | sft | 360.00 |
B431 | Structure at 17th Floor | sft | 370.00 |
B432 | Structure at 18th Floor | sft | 380.00 |
B433 | Structure at 19th Floor | sft | 390.00 |
B434 | Dismantling RCC | sum | 99999.99 |
B435 | Concreting Superstructure | cft | 19.00 |
B436 | Re-bar fabrication-Supers | kg | 8.60 |
B437 | Shuttering-Superstructure | sft | 42.00 |
B438 | RCC Work-Superstructure | cft | 50.00 |
B439 | Re-bar Epoxy Work | no. | 25.00 |