B3 Labour-Substructur-2
Code Item Unit Rate(Tk.)
B301 Excavation upto 16ft dept cft
15.00
B302 Excavation from 16-33ft cft
20.00
B303 Excavation from 33-50ft cft
25.00
B304 Excavation from 31-36ft cft
16.00
B305 Bracing Installing -Joist kg
25.00
B306 Bracing Remove-Joist kg
18.00
B307 MS Pipe Driving No.
8000.00
B308 Structure-Mat-Basement-3 sft
200.00
B309 Structure-Basement-2 sft
195.00
B310 Structure-Basement-1 sft
190.00
B311 Structure-Ground-Level sft
185.00
B312 Brick Work-125mm Thick sft
15.00
B313 Brick Work-250mm Thick cft
18.00
B314 Plaster-12mm Thick sft
10.00
B315 Excavation above 0.0 ft cft
3.50
B316 MS Rod Unloading1 kg
0.00
B317 MS Joist Unloading kg
0.00
B318 MS Plate Unloading kg
0.00
B319 MS Pipe Unloading kg
0.00
B320 Excavation upto 18m cft
14.55
B321 Ready Mix Concer-Wall cft
35.00
B322 Ready Mix Concret-Col/Bea cft
50.00
B323 Ready Mix Concrete-Base2 cft
77.50
B324 Ready Mix Concrete-Base-1 cft
100.00
B325 Shuttering-Sub-structure sft
45.00
B326 Readymix Concreting-Mat cft
45.00
B327 Re-bar Fabrication-Substr kg
12.00
B328 Cashion Shuter-Place/rem sft
77.50
B329 Sand Lift, remove fm Casi cft
70.65
B330 Salvage-Joist/ Pipe Cut ton
10000.00
B331 KIngPost Pile Breaking cft
250.00
B332 Salvage-Joist/ Pipe Lift ton
10000.00
B333 Salvage-Broken RCC Remove cft
100.00
B334 MS Joist Fabricating kg
22.00
B335 Bracing Dismantling-Joist kg
20.00
B336 Bituminous Paper fixing sft
10.20
B337 Readymix Concret-Substr cft
35.00
B338 Readymix Conc-Basemn-Slab cft
38.50
B339 Re-bar Unloading kg
3.00
B340 Lifting-Excavator,Gen,Wel no.
99999.99
B341 Lifting-Pipe,BillBoard,Si no.
99999.99
B342 RCC Dismntl,remov fm cass no
99999.99
B343 Steeicut,remov fm cassion no.
99999.99
B344 Equip,tool lift,remove no.
99999.99
B345 Cassion withdraw fm bot sqm
2322.55
B346 Backfill Cashion void man cft
56.63
B347 Air flow, exhaust fan-Cas day
5000.00
B348 ShoreTemporary casing Drv rft
2714.11
B349 Shore-Pile-Excavat-Fill cft
50.00
B350 Shore Pile-Salvage rempva no.
99999.99
B351 Shore Pile-Dewatering day
4480.00
B352 Shore Pile-Air supply day
3500.00
B353 Dewatering per cassion day
8000.00
B354 Tie beam-Earth removal cft
50.00
B355 Pile Head Finishing Manua no,
3000.00
B356 Pile Rod clean, straigten no.
3000.00
B357 Working Bed Preparation sft
139.35
B358 Safety Railing i/c Paint rft
50.00
B359 Fabrication Steel Shutter sft
75.00
B360 Water Stopper fixing rft
20.00