ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
B0 | Sub-Contractor-Civil | ||
Code | Item | Unit | Rate(Tk.) |
B001 | Retrofitting-Advance | LS | 99999.99 |
B002 | Retrofitting-2nd Install | LS | 99999.99 |
B003 | Retrofitting-3rd Install | LS | 99999.99 |
B004 | Retrofitting-4th Install | LS | 99999.99 |
B005 | Retrofitting-5th Install | LS | 99999.99 |
B006 | Retrofitting-6th Install | LS | 99999.99 |
B007 | Shutter Reparing | sft | 90.00 |
B008 | Pile Integrity Test | no. | 3000.00 |
B009 | Pile Gap Seal-Ferrocement | sft | 300.00 |
B010 | Dewatering-Substructure | day | 6865.00 |
B011 | Shed with Bamboo Tripol | sft | 70.00 |
B012 | Trial Shore Pile-1000mm | no. | 99999.99 |
B013 | Obstacle Remove-Shore Cas | rft | 2722.95 |
B014 | Shore Pile temp casing dr | rft | 2714.11 |
B015 | Shore pile excavat-fillin | cft | 50.00 |
B016 | Shore/Seal Pile mud remov | cft | 27.18 |
B017 | Shore/Seal Pile dewaterin | day | 4480.00 |
B018 | Shor Pile Air Supply | day | 3500.00 |
B019 | Shore Pile Salvage Removl | LS | 99999.99 |
B020 | Tie-Beam Earth Removal | cft | 50.00 |
B021 | Column Retrofitting | LS | 99999.99 |