BREAKDOWN OF UNIT PRICE
Item: (C03D2) Steel Shutter-Slab-10th-11th Flr
Basis:350 sft
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Shuttering-10h-11th Floor
350.000
sft
60.00
21000.00
Sub-Total(B4)
21000.00
645.84
D3.Shuttering-Hardware
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Steel Shutter-use 3 time
350.000
sft
216.67
75834.50
MS Prop-use 20 times
88.000
no.
90.00
7920.00
Shutter Oil
350.000
sft
5.00
1750.00
Scaffolding-use 40 times
10.000
set
15.00
150.00
Nut-bolt, J-hook-use 8tim
12.000
kg
12.50
150.00
Hessain for Water Tight
350.000
sft
1.00
350.00
MS Box-50x100-use10 times
565.000
rft
13.50
7627.50
MS Pipe-50mm-use 20 times
162.000
rft
5.00
810.00
Sub-Total(D3)
94592.00
2909.11
Total(1)
3554.95
Add over head on Total(1)
5.0 %
177.75
Total(2)
3732.70
Add Profit on Total(2)
10.0 %
373.27
Total(3)
4105.97
Add VAT on Unit Price
5.5 %
252.32
Add Income Tax on Unit Price
5.0 %
229.38
Unit Price
4587.67
Say
4588
per Sqm