BREAKDOWN OF UNIT PRICE |
Item: (C03B2) Steel Shutter-Slab-Gr-4th Floor |
Basis:350
sft |
|
B4.Labour SuperStructu |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Shuttering-Gr-4th Floor |
350.000 |
sft |
45.00 |
|
|
|
|
Sub-Total(B4) |
15750.00
|
484.38
|
|
D3.Shuttering-Hardware |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Steel Shutter-use 3 time |
350.000 |
sft |
216.67 |
|
|
|
MS Prop-use 20 times |
88.000 |
no. |
90.00 |
|
|
|
Shutter Oil |
350.000 |
sft |
5.00 |
|
|
|
Scaffolding-use 40 times |
10.000 |
set |
15.00 |
|
|
|
Nut-bolt, J-hook-use 8tim |
12.000 |
kg |
12.50 |
|
|
|
Hessain for Water Tight |
350.000 |
sft |
1.00 |
|
|
|
MS Box-50x100-use10 times |
565.000 |
rft |
13.50 |
|
|
|
MS Pipe-50mm-use 20 times |
162.000 |
rft |
5.00 |
|
|
|
|
Sub-Total(D3) |
94592.00
|
2909.11
|
|
|
|
|
Total(1) |
|
3393.49
|
|
|
Add over head on Total(1)
|
5.0 % |
169.67
|
|
|
|
|
Total(2) |
|
3563.16
|
|
|
Add Profit on Total(2)
|
10.0
% |
356.32
|
|
|
|
|
Total(3) |
|
3919.48
|
|
|
Add VAT on Unit Price
|
5.5 % |
240.86
|
|
Add Income Tax on Unit Price
|
5.0 % |
218.97
|
|
|
|
|
Unit Price |
|
4379.31
|
|
|
|
|
|
Say |
4379 |
per Sqm |