BREAKDOWN OF UNIT PRICE
Item: (C03B2) Steel Shutter-Slab-Gr-4th Floor
Basis:350 sft
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Shuttering-Gr-4th Floor
350.000
sft
45.00
15750.00
Sub-Total(B4)
15750.00
484.38
D3.Shuttering-Hardware
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Steel Shutter-use 3 time
350.000
sft
216.67
75834.50
MS Prop-use 20 times
88.000
no.
90.00
7920.00
Shutter Oil
350.000
sft
5.00
1750.00
Scaffolding-use 40 times
10.000
set
15.00
150.00
Nut-bolt, J-hook-use 8tim
12.000
kg
12.50
150.00
Hessain for Water Tight
350.000
sft
1.00
350.00
MS Box-50x100-use10 times
565.000
rft
13.50
7627.50
MS Pipe-50mm-use 20 times
162.000
rft
5.00
810.00
Sub-Total(D3)
94592.00
2909.11
Total(1)
3393.49
Add over head on Total(1)
5.0 %
169.67
Total(2)
3563.16
Add Profit on Total(2)
10.0 %
356.32
Total(3)
3919.48
Add VAT on Unit Price
5.5 %
240.86
Add Income Tax on Unit Price
5.0 %
218.97
Unit Price
4379.31
Say
4379
per Sqm