BREAKDOWN OF UNIT PRICE
Item: (C01U5) Concrete-4500psi-19th Floor
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Sub-Total(A1)
28000.00
9888.20
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 19th Floor
84.118
sft
390.00
32806.02
Sub-Total(B4)
32806.02
11585.45
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1900.000
cft
0.75
1425.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
2525.00
891.70
Total(1)
22365.35
Add over head on Total(1)
5.0 %
1118.27
Total(2)
23483.62
Add Profit on Total(2)
10.0 %
2348.36
Total(3)
25831.98
Add VAT on Unit Price
5.5 %
1587.44
Add Income Tax on Unit Price
5.0 %
1443.13
Unit Price
28862.55
Say
28863
per Cum