BREAKDOWN OF UNIT PRICE |
Item: (C01S2) Concrete-32Mpa-Slab-5th-9th Floor |
Basis:100
cft |
|
A1.Material Cost-Civil |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Ready Mix Concrete-4500ps |
100.000 |
cft |
280.00 |
|
|
|
|
Sub-Total(A1) |
28000.00
|
9888.20
|
|
B4.Labour SuperStructu |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Ready-mix Concret-5th-9th |
100.000 |
cft |
65.00 |
|
|
|
|
Sub-Total(B4) |
6500.00
|
2295.48
|
|
D3.Shuttering-Hardware |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Scaffolding-use 40 times |
5.000 |
set |
15.00 |
|
|
|
|
Sub-Total(D3) |
75.00
|
26.49
|
|
E1.Equipment Cost |
|
Item |
Quantity |
Unit |
Rate(Tk.) |
Cost(Tk.) |
Rate(Tk.) |
|
Vibrator |
100.000 |
cft |
5.00 |
|
|
|
Concrete Pump-5th-9th Flr |
100.000 |
cft |
10.00 |
|
|
|
|
Sub-Total(E1) |
1500.00
|
529.73
|
|
|
|
|
Total(1) |
|
12739.89
|
|
|
Add over head on Total(1)
|
5.0 % |
636.99
|
|
|
|
|
Total(2) |
|
13376.88
|
|
|
Add Profit on Total(2)
|
10.0
% |
1337.69
|
|
|
|
|
Total(3) |
|
14714.57
|
|
|
Add VAT on Unit Price
|
5.5 % |
904.25
|
|
Add Income Tax on Unit Price
|
5.0 % |
822.04
|
|
|
|
|
Unit Price |
|
16440.86
|
|
|
|
|
|
Say |
16441 |
per Cum |