BREAKDOWN OF UNIT PRICE
Item: (C01Q5) Concrete-4500psi-15th Floor
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Sub-Total(A1)
28000.00
9888.20
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 15th Floor
84.118
sft
350.00
29441.30
Sub-Total(B4)
29441.30
10397.20
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1500.000
cft
0.75
1125.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
2225.00
785.76
Total(1)
21071.15
Add over head on Total(1)
5.0 %
1053.56
Total(2)
22124.71
Add Profit on Total(2)
10.0 %
2212.47
Total(3)
24337.18
Add VAT on Unit Price
5.5 %
1495.58
Add Income Tax on Unit Price
5.0 %
1359.62
Unit Price
27192.38
Say
27192
per cum