BREAKDOWN OF UNIT PRICE
Item: (C01N2) Concrete-3500psi-12th Floor Roof
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-3500ps
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 12th Floor
84.118
sft
174.40
14670.18
Sub-Total(B4)
14670.18
5180.77
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1300.000
cft
0.75
975.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
2075.00
732.79
Total(1)
14742.31
Add over head on Total(1)
5.0 %
737.12
Total(2)
15479.43
Add Profit on Total(2)
10.0 %
1547.94
Total(3)
17027.37
Add VAT on Unit Price
5.5 %
1046.37
Add Income Tax on Unit Price
5.0 %
951.25
Unit Price
19024.99
Say
19025
per cum