BREAKDOWN OF UNIT PRICE
Item: (C01M2) Concrete-3500psi-11th Floor Roof
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-3500ps
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 11th Floor
86.455
sft
168.95
14606.57
Sub-Total(B4)
14606.57
5158.31
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1200.000
cft
0.75
900.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
2000.00
706.30
Total(1)
14693.36
Add over head on Total(1)
5.0 %
734.67
Total(2)
15428.03
Add Profit on Total(2)
10.0 %
1542.80
Total(3)
16970.83
Add VAT on Unit Price
5.5 %
1042.90
Add Income Tax on Unit Price
5.0 %
948.09
Unit Price
18961.82
Say
18962
per cum