BREAKDOWN OF UNIT PRICE
Item: (C01L2) Concrete-3500psi-10th Floor Roof
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-3500ps
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 10th Floor
86.455
sft
163.50
14135.39
Sub-Total(B4)
14135.39
4991.91
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1100.000
cft
0.75
825.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
1925.00
679.81
Total(1)
14500.48
Add over head on Total(1)
5.0 %
725.02
Total(2)
15225.50
Add Profit on Total(2)
10.0 %
1522.55
Total(3)
16748.05
Add VAT on Unit Price
5.5 %
1029.21
Add Income Tax on Unit Price
5.0 %
935.65
Unit Price
18712.91
Say
18713
per cum