Return Main Menu
BREAKDOWN OF UNIT PRICE
Item: (C01H2) Concrete-3500psi-7th Floor Roof
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-3500ps
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 7th Floor
86.455
sft
147.15
12721.85
Sub-Total(B4)
12721.85
4492.72
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
800.000
cft
0.75
600.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
1700.00
600.36
Total(1)
13921.83
Add over head on Total(1)
5.0 %
696.09
Total(2)
14617.92
Add Profit on Total(2)
10.0 %
1461.79
Total(3)
16079.71
Add VAT on Unit Price
5.5 %
988.14
Add Income Tax on Unit Price
5.0 %
898.31
Unit Price
17966.16
Say
17966
per cum