BREAKDOWN OF UNIT PRICE
Item: (C01F1) Concrete-4500psi-5th Floor
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Sub-Total(A1)
28000.00
9888.20
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 5th Floor
86.455
sft
136.25
11779.49
Sub-Total(B4)
11779.49
4159.93
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
500.000
cft
0.75
375.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
1475.00
520.90
Total(1)
14569.02
Add over head on Total(1)
5.0 %
728.45
Total(2)
15297.48
Add Profit on Total(2)
10.0 %
1529.75
Total(3)
16827.22
Add VAT on Unit Price
5.5 %
1034.08
Add Income Tax on Unit Price
5.0 %
940.07
Unit Price
18801.37
Say
18801
per cum