BREAKDOWN OF UNIT PRICE
Item: (C01B1) Concrete-4500psi -1st Floor
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Sub-Total(A1)
28000.00
9888.20
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 1st Floor
84.118
sft
114.45
9627.31
Sub-Total(B4)
9627.31
3399.88
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
100.000
cft
0.75
75.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
1175.00
414.95
Total(1)
13703.03
Add over head on Total(1)
5.0 %
685.15
Total(2)
14388.19
Add Profit on Total(2)
10.0 %
1438.82
Total(3)
15827.00
Add VAT on Unit Price
5.5 %
972.61
Add Income Tax on Unit Price
5.0 %
884.19
Unit Price
17683.80
Say
17684
per cum