BREAKDOWN OF UNIT PRICE
Item: (B10B) Plaster with NCF
Basis:100 sft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement-CEM-II/A,52.5-PCC
1.500
bag
375.00
562.50
Local Sand (FM=1.2)
7.500
cft
18.00
135.00
Sub-Total(A1)
697.50
75.08
B2.Labour-Substructur-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Plaster with NCF
0.000
sft
6.00
0.00
Sub-Total(B2)
0.00
0.00
Total(1)
75.08
Add over head on Total(1)
5.0 %
3.75
Total(2)
78.83
Add Profit on Total(2)
10.0 %
7.88
Total(3)
86.72
Add VAT on Unit Price
5.5 %
5.33
Add Income Tax on Unit Price
5.0 %
4.84
Unit Price
96.89
Say
97
per M2