BREAKDOWN OF UNIT PRICE
Item: (B06H) Concrete-C-25-Column, Wall
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-C-25
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concreteing-Col,Shear
100.000
cft
50.00
5000.00
Sub-Total(B4)
5000.00
1765.75
D2.Others-Structure
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Laboratory Test
100.000
cft
3.00
300.00
Sub-Total(D2)
300.00
105.95
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Tower Crane
0.100
day
50000.00
5000.00
Roof Hoist
0.100
day
2000.00
200.00
Vibrator
100.000
cft
5.00
500.00
Sub-Total(E1)
5700.00
2012.96
Total(1)
12713.40
Add over head on Total(1)
5.0 %
635.67
Total(2)
13349.07
Add Profit on Total(2)
10.0 %
1334.91
Total(3)
14683.98
Add VAT on Unit Price
5.5 %
902.37
Add Income Tax on Unit Price
5.0 %
820.33
Unit Price
16406.68
Say
16407
per Cum