BREAKDOWN OF UNIT PRICE
Item: (B05B4) Lean Concrete(1:3:6)
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Cement-CEM-II/A,52.5-PCC
12.000
bag
375.00
4500.00
Local Sand (FM=1.2)
45.000
cft
18.00
810.00
Brick Chips-20mm
90.000
cft
110.00
9900.00
Sub-Total(A1)
15210.00
5371.41
B2.Labour-Substructur-1
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
CC Work
100.000
cft
30.00
3000.00
Sub-Total(B2)
3000.00
1059.45
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
300.00
105.95
Total(1)
6536.81
Add over head on Total(1)
5.0 %
326.84
Total(2)
6863.65
Add Profit on Total(2)
10.0 %
686.36
Total(3)
7550.01
Add VAT on Unit Price
5.5 %
463.97
Add Income Tax on Unit Price
5.0 %
421.79
Unit Price
8435.77
Say
8436
per Cum