Costing for Pile and GB for boundary wall at Te-Park | |||||||||
Item | Description | BOQ Qty | Bill Qty | Unit | S.Rate(Tk.) | A.Rate(Tk.) | BOQ Amount | Bill Amount | Con. Amount | A101 | Filling Sand |
0.000 |
0.000 |
cft | 8.50 |
0.00 |
0.00 |
0.00 |
0.00 |
A103 | Sand - Local - Mymensingh |
0.000 |
0.000 |
cft | 13.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A105 | Cement |
0.000 |
0.000 |
bag | 343.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A106 | Sand - Sylhet |
0.000 |
0.000 |
cft | 24.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A107 | Stone-chips |
0.000 |
0.000 |
cft | 80.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A112 | GI Wire |
0.000 |
0.000 |
kg | 90.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A114 | Re-bar G60 |
0.000 |
0.000 |
kg | 40.20 |
0.00 |
0.00 |
0.00 |
0.00 |
A125 | Filling Earth |
0.000 |
0.000 |
cft | 6.60 |
0.00 |
0.00 |
0.00 |
0.00 |
E101 | Mini Roller Compaction |
0.000 |
0.000 |
cft | 1.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E102 | Mixer m/c and vibrator |
0.000 |
0.000 |
cft | 2.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E103 | Mini Dumper |
0.000 |
0.000 |
cft | 2.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E106 | Batching Plant , Vibrator |
0.000 |
0.000 |
cft | 8.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E107 | Pile driving equipment |
0.000 |
0.000 |
set | 2000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E108 | Fuel (diesel for piling) |
0.000 |
0.000 |
Ltr | 33.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E109 | Lubricant |
0.000 |
0.000 |
Ltr | 115.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E110 | Crane |
0.000 |
0.000 |
rft | 31.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E111 | Trailer |
0.000 |
0.000 |
rft | 21.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E118 | Diesel |
0.000 |
0.000 |
Ltr | 26.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E119 | Mobil |
0.000 |
0.000 |
Ltr | 70.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E120 | Hydraulic Oil |
0.000 |
0.000 |
Ltr | 80.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E128 | Payloader |
0.000 |
0.000 |
day | 8000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E136 | Dump Truck |
0.000 |
0.000 |
day | 8300.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E142 | Pile Driving Equipment(M) |
0.000 |
0.000 |
day | 1000.00 |
0.00 |
0.00 |
0.00 |
0.00 |
E143 | Mini Roller |
0.000 |
0.000 |
day | 500.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L000 | Form work Foot-col-Str |
0.000 |
0.000 |
sft | 6.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L001 | Re-bar Work |
0.000 |
0.000 |
kg | 1.65 |
0.00 |
0.00 |
0.00 |
0.00 |
L002 | Formwork upto 10ft from P |
0.000 |
0.000 |
sft | 8.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L004 | Ordinary Labour Supply |
0.000 |
0.000 |
nos. | 100.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L005 | Head Mason Supply |
0.000 |
0.000 |
nos. | 200.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L009 | Sand Screening |
0.000 |
0.000 |
cft | 1.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L011 | Carpenter Helper |
0.000 |
0.000 |
nos. | 150.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L014 | Local carrying Rod |
0.000 |
0.000 |
kg | 0.25 |
0.00 |
0.00 |
0.00 |
0.00 |
L016 | RCC Casting. |
0.000 |
0.000 |
cft | 8.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L065 | Welding surface cleaning |
0.000 |
0.000 |
no | 10.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L074 | Pile driving (250x250mm) |
0.000 |
0.000 |
rft | 50.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L077 | E/Cutting |
0.000 |
0.000 |
cft | 2.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L128 | Pile shifting, driving |
0.000 |
0.000 |
rft | 143.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M102 | Steel Forms |
0.000 |
0.000 |
sft | 5.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M105 | Shoring for Excavation |
0.000 |
0.000 |
sft | 2.15 |
0.00 |
0.00 |
0.00 |
0.00 |
M109 | Welding Electrode VM 8-no |
0.000 |
0.000 |
pack | 520.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M111 | Pile Shutter (steel) |
0.000 |
0.000 |
sft | 12.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M112 | Cost of Pre-casr yard |
0.000 |
0.000 |
rft | 8.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M116 | Hardware materials |
0.000 |
0.000 |
LS | 140.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M129 | Stone Cutting Disc - 175 |
0.000 |
0.000 |
no | 70.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M133 | Cheisel - Hammer |
0.000 |
0.000 |
no | 55.00 |
0.00 |
0.00 |
0.00 |
0.00 |
---|---|---|---|---|---|---|---|---|---|
Total: | 0.00 |
0.00 |
0.00 |
;