Return Main Menu

;
Costing for Pile and GB for boundary wall at Te-Park
Item Description BOQ Qty Bill Qty Unit S.Rate(Tk.) A.Rate(Tk.) BOQ Amount Bill Amount Con. Amount
A101
Filling Sand
0.000
0.000
cft
8.50
0.00
0.00
0.00
0.00
A103
Sand - Local - Mymensingh
0.000
0.000
cft
13.00
0.00
0.00
0.00
0.00
A105
Cement
0.000
0.000
bag
343.00
0.00
0.00
0.00
0.00
A106
Sand - Sylhet
0.000
0.000
cft
24.00
0.00
0.00
0.00
0.00
A107
Stone-chips
0.000
0.000
cft
80.00
0.00
0.00
0.00
0.00
A112
GI Wire
0.000
0.000
kg
90.00
0.00
0.00
0.00
0.00
A114
Re-bar G60
0.000
0.000
kg
40.20
0.00
0.00
0.00
0.00
A125
Filling Earth
0.000
0.000
cft
6.60
0.00
0.00
0.00
0.00
E101
Mini Roller Compaction
0.000
0.000
cft
1.00
0.00
0.00
0.00
0.00
E102
Mixer m/c and vibrator
0.000
0.000
cft
2.00
0.00
0.00
0.00
0.00
E103
Mini Dumper
0.000
0.000
cft
2.00
0.00
0.00
0.00
0.00
E106
Batching Plant , Vibrator
0.000
0.000
cft
8.00
0.00
0.00
0.00
0.00
E107
Pile driving equipment
0.000
0.000
set
2000.00
0.00
0.00
0.00
0.00
E108
Fuel (diesel for piling)
0.000
0.000
Ltr
33.00
0.00
0.00
0.00
0.00
E109
Lubricant
0.000
0.000
Ltr
115.00
0.00
0.00
0.00
0.00
E110
Crane
0.000
0.000
rft
31.00
0.00
0.00
0.00
0.00
E111
Trailer
0.000
0.000
rft
21.00
0.00
0.00
0.00
0.00
E118
Diesel
0.000
0.000
Ltr
26.00
0.00
0.00
0.00
0.00
E119
Mobil
0.000
0.000
Ltr
70.00
0.00
0.00
0.00
0.00
E120
Hydraulic Oil
0.000
0.000
Ltr
80.00
0.00
0.00
0.00
0.00
E128
Payloader
0.000
0.000
day
8000.00
0.00
0.00
0.00
0.00
E136
Dump Truck
0.000
0.000
day
8300.00
0.00
0.00
0.00
0.00
E142
Pile Driving Equipment(M)
0.000
0.000
day
1000.00
0.00
0.00
0.00
0.00
E143
Mini Roller
0.000
0.000
day
500.00
0.00
0.00
0.00
0.00
L000
Form work Foot-col-Str
0.000
0.000
sft
6.00
0.00
0.00
0.00
0.00
L001
Re-bar Work
0.000
0.000
kg
1.65
0.00
0.00
0.00
0.00
L002
Formwork upto 10ft from P
0.000
0.000
sft
8.00
0.00
0.00
0.00
0.00
L004
Ordinary Labour Supply
0.000
0.000
nos.
100.00
0.00
0.00
0.00
0.00
L005
Head Mason Supply
0.000
0.000
nos.
200.00
0.00
0.00
0.00
0.00
L009
Sand Screening
0.000
0.000
cft
1.00
0.00
0.00
0.00
0.00
L011
Carpenter Helper
0.000
0.000
nos.
150.00
0.00
0.00
0.00
0.00
L014
Local carrying Rod
0.000
0.000
kg
0.25
0.00
0.00
0.00
0.00
L016
RCC Casting.
0.000
0.000
cft
8.00
0.00
0.00
0.00
0.00
L065
Welding surface cleaning
0.000
0.000
no
10.00
0.00
0.00
0.00
0.00
L074
Pile driving (250x250mm)
0.000
0.000
rft
50.00
0.00
0.00
0.00
0.00
L077
E/Cutting
0.000
0.000
cft
2.00
0.00
0.00
0.00
0.00
L128
Pile shifting, driving
0.000
0.000
rft
143.00
0.00
0.00
0.00
0.00
M102
Steel Forms
0.000
0.000
sft
5.00
0.00
0.00
0.00
0.00
M105
Shoring for Excavation
0.000
0.000
sft
2.15
0.00
0.00
0.00
0.00
M109
Welding Electrode VM 8-no
0.000
0.000
pack
520.00
0.00
0.00
0.00
0.00
M111
Pile Shutter (steel)
0.000
0.000
sft
12.00
0.00
0.00
0.00
0.00
M112
Cost of Pre-casr yard
0.000
0.000
rft
8.00
0.00
0.00
0.00
0.00
M116
Hardware materials
0.000
0.000
LS
140.00
0.00
0.00
0.00
0.00
M129
Stone Cutting Disc - 175
0.000
0.000
no
70.00
0.00
0.00
0.00
0.00
M133
Cheisel - Hammer
0.000
0.000
no
55.00
0.00
0.00
0.00
0.00
Total:
0.00
0.00
0.00