Costing for Painting-Infront of Load-unload of LL-2 | |||||||||
Item | Description | BOQ Qty | Bill Qty | Unit | S.Rate(Tk.) | A.Rate(Tk.) | BOQ Amount | Bill Amount | Con. Amount | A302 | Epoxy Primer |
0.000 |
0.000 |
Ltr | 170.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A303 | Epoxy Enamel |
0.000 |
0.000 |
Ltr | 387.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A308 | Thinner-T6/T7 |
0.000 |
0.000 |
Ltr | 46.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A328 | Chalk powder |
0.000 |
0.000 |
kg | 18.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A329 | Mosaic stone |
0.000 |
0.000 |
no | 110.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A330 | Scrap |
0.000 |
0.000 |
L.s | 30.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L627 | Epoxy Paint-Floor |
0.000 |
0.000 |
sft | 7.00 |
0.00 |
0.00 |
0.00 |
0.00 |
---|---|---|---|---|---|---|---|---|---|
Total: | 0.00 |
0.00 |
0.00 |
;