Costing for MDI Finishing Work | |||||||||
Item | Description | BOQ Qty | Bill Qty | Unit | S.Rate(Tk.) | A.Rate(Tk.) | BOQ Amount | Bill Amount | Con. Amount | A303 | Epoxy Enamel |
0.000 |
0.000 |
Ltr | 387.00 |
0.00 |
0.00 |
0.00 |
0.00 |
A308 | Thinner-T6/T7 |
0.000 |
0.000 |
Ltr | 46.00 |
0.00 |
0.00 |
0.00 |
0.00 |
B108 | uPVC Pipe 150 dia |
0.000 |
0.000 |
rft | 115.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L004 | Ordinary Labour Supply |
0.000 |
0.000 |
nos. | 100.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L005 | Head Mason Supply |
0.000 |
0.000 |
nos. | 200.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L406 | uPVC Pipe fitting-100 mm |
0.000 |
0.000 |
rft | 15.00 |
0.00 |
0.00 |
0.00 |
0.00 |
L636 | Epoxy paint Wall(R/Final) |
0.000 |
0.000 |
sft | 1.50 |
0.00 |
0.00 |
0.00 |
0.00 |
M106 | Steel Scaffolding |
0.000 |
0.000 |
set | 100.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M131 | Diamond Cutiing Disc -100 |
0.000 |
0.000 |
no | 600.00 |
0.00 |
0.00 |
0.00 |
0.00 |
M133 | Cheisel - Hammer |
0.000 |
0.000 |
no | 55.00 |
0.00 |
0.00 |
0.00 |
0.00 |
S218 | Aluminium Louver |
0.000 |
0.000 |
sft | 310.00 |
0.00 |
0.00 |
0.00 |
0.00 |
S234 | Plaster Board Ceiling |
0.000 |
0.000 |
sft | 125.00 |
0.00 |
0.00 |
0.00 |
0.00 |
S289 | Aluminium Fabricator |
0.000 |
0.000 |
no. | 300.00 |
0.00 |
0.00 |
0.00 |
0.00 |
---|---|---|---|---|---|---|---|---|---|
Total: | 0.00 |
0.00 |
0.00 |
;