Item |
Description |
Quantity |
Unit |
Rate(Tk) |
Amount(Tk) |
01 |
125 mm thick ordinary brick work (1:4) including supplying and carrying of bricks, sorting and soaking of bricks (Min 24 hours), curing (Minimum 10 days). Bricks to be soaked for 24 hours in two stages of 12 hours. Fresh water to be used for each stage of soaking. All complete as per drawing and direction of the Engineer-In-Charge. |
25.00 |
M2 |
425.00 |
10,625.00 |
02 |
Average 20 mm thick cement plaster (1:6) to wall maintaining sharp angle at corners, joints, kobla etc. with steel trowel finish including supplying of best quality coarse sand, screening, curing for minimum 10 days all complete as per dorection of the E.I.C. |
50.00 |
M2 |
120.00 |
6,000.00 |
03 |
Supplying, fitting and fixing of non - exposed fixed screw up suspended plaster board ceiling with aluminium T-bar , filling the joints with thin cotton properly as per approved sample and drawing including all fittings , accessories make provisions for opening as per direction of the EIC . |
27.00 |
M2 |
1450.00 |
39,150.00 |
04 |
Supplying, fitting and fixing of non-exposed grid type with G.P sheet screwup
suspended plaster board ceiling as per approved sample and drawing including all fittings , accessories make provisions for opening as per direction of the EIC.(Grid 600x1200mm)
|
470.00 |
M2 |
600.00 |
282,000.00 |
05A |
Supplying , fitting and fixing of Aluminium fixed partition as per U.S AAMA standard specification having 1.2 mm thick outer bottom , top and sides (size 45 mm , 45 mm) all aluminum members of pre approved manufacturer of powder coated pure white colour including all accessories , supplying and fitting neoprene , sealent all complete as per approved drawing and direction of the EIC.
Aluminium partition wall with frosted glass, H=2400 mm |
190.00 |
M2 |
2500.00 |
475,000.00 |
05B |
Aluminium partition wall with frosted glass, H=2100 mm |
88.00 |
M2 |
2500.00 |
220,000.00 |
05C |
Aluminium partition wall with clear glass, H=2400 mm |
10.00 |
M2 |
2400.00 |
24,000.00 |
06 |
Supplying, fitting and fixing of plaster board dry wall with aluminium C-channel , filling the joints with cloth tape properly as per approved sample and drawing including all fittings , accessories make provisions for opening as per direction of the EIC . |
18.00 |
M2 |
1450.00 |
26,100.00 |
07 |
Supplying , fitting and fixing of Aluminium composite swing doors ,(half plastic wood and half frosted glass) with fixed partition as per U.S AAMA standard specification having 1.8 mm thick wall frame (size 101.6mm , 40 mm )1.8 mm thick shutter sides (size 50 mm , 40 mm ) , 0.49 mm thick door glass bit (size 16.54 mm , 14.49 mm ) , 2.5 mm thick closure section (size 101.6 mm , 40 mm) 2.3 mm to 4 mm thick handle (size 101.6 mm , 38.1 mm ) sections all aluminium members of pre approved manufacturer of powder coated pure white colour incl
uding all accessories , supplying and fitting 5 mm thick white clear glass and 5 mm thick plastic panel with neoprene , sealent all complete as per direction of the EIC. |
54.00 |
M2 |
5500.00 |
297,000.00 |
08 |
Fitting and fixing of Toilet cubicles including door shutter, fittings, accessories, all complete as per approved sample and direction of the EIC. |
28.00 |
M2 |
200.00 |
5,600.00 |
09 |
Epoxy painting (berger or equivalent) of best quality and approved colour to wall two coats over a coat of primer including cleaning, sand papering the surface all complete as per direction of the EIC.(including supply of all materials) |
280.00 |
M2 |
350.00 |
98,000.00 |
10 |
Epoxy painting (berger or equivalent) of best quality and approved colour to plastered board ceiling two coats over a coat of primer including cleaning, joint filling with cloths all complete as per direction of the EIC. (including supply of all materials) |
110.00 |
M2 |
350.00 |
38,500.00 |
11 |
Construction of Overhead Tank base on Plant room roof with 250 mm thick brick wall (1:6) as per design and 100 mm thick R.c.c slab (1:1.5:3) with minimum 1.5% reinforcement as per design including supplying all materials , plaster , weathercoat paint , all complete as per approved drawing and direction of the EIC. |
1.00 |
NO |
17000.00 |
17,000.00 |
12A |
Aluminium Hinged Door |
0.00 |
M2 |
4800.00 |
0.00 |
12B |
Suipply, Fitting and Fixing of SS Sink |
0.00 |
NO. |
3000.00 |
0.00 |
12C |
Tiles Fitting excuding cost of Tiles |
0.00 |
M2 |
800.00 |
0.00 |
12D |
Applying Paintable Sealant i/c supply of Sealant. |
0.00 |
RM |
87.00 |
0.00 |
12E |
Applying Sealant - Labour Charge |
0.00 |
RM |
8.50 |
0.00 |
|
|
|
|
Total: |
1,538,975.00 |