04 |
250 mm or more thick ordinary brick work (1:5) including supplying of coarse sand, bricks, sorting and soaking of bricks (minimum 24 hours with fresh water), curing for min 10 days all complete as per direction of the EIC . |
3.50 |
M3 |
2900.00 |
10,150.00 |
05 |
Average 20 mm thick cement plaster (1:6) to wall maintaining sharp angle at corners, joints, kobla etc. with steel trowel finish including supplying of best quality coarse sand, screening, curing for minimum 10 days all complete as per dorection of the E.I.C. |
50.00 |
M2 |
110.00 |
5,500.00 |
09B |
(1:3:6) Mass concrete in foundation or floor or where necessary as per drawing with cement, sand (F.M. 1.2) and stone chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days etc. all complete as per drawing, specification and direction of the Engineer.
|
0.00 |
M3 |
4500.00 |
0.00 |