BOQ (Press Item for Analysis)

BOQ for Automatic Sliding Gate
Item Description Quantity Unit Rate(Tk) Amount(Tk)
01
18.00
M2
195.00
3,510.00
02
13.00
M2
156.00
2,028.00
03
Earth work in excavation of foundation trenches of any dimension upto required depth including removal of soil to a required distance within the site with necessary shoring and bailing out of water, if necessary as per drawing and instruction of the EIC.
8.00
M3
86.00
688.00
04
Single layer ordinary brick flat soling in foundation and floor , where necessary with 1st class ordinary bricks including suppling of sand , sorting and soaking of bricks (min 8 hours), levelling, laying and filling the interstices with fine sand as per drawing and direction of EIC. Including brick supply .
20.00
M2
150.00
3,000.00
05
Supplying and laying of single layer polythene sheet weighing one Kilogram per 6.5 square metre (min. 0.05 mm thick) in floor and foundation above the brick flat soling all complete as per direction of Engineer-in-charge.
20.00
M2
13.00
260.00
06
Drain
3.00
M3
5400.00
16,200.00
07
0.60
TON
35575.00
21,345.00
08
27.50
M2
7865.00
216,287.50
Total:
263,318.50