BOQ (Press Item for Analysis)

BOQ for Approach Road for Solvent Store
Item Description Quantity Unit Rate(Tk) Amount(Tk)
01A
Sand filling (F.M 0.80) in layers of 150mm maximum. Compacting upto required depth. Desired leveling and camber of peripheryhas to be achieved as per drawing and direction of the Engineer-In-charge. Before, starting sand filling existing level will be measured and after completion of sand filling measurement will be taken of the same location. (as compacted volume)
400.00
M3
425.00
170,000.00
01B
Supplying and laying of filling sand having minimum F.M. 0.80 over the compacted earth surface in 150mm layers including leveling watering consolidating each layer upto finished level as per Direction of the EIC.
1000.00
M3
390.00
390,000.00
02
520.00
M2
240.00
124,800.00
03
Single layer (3") 1st class ordinary brick flat soling in floor and other places where necessary including sorting and soaking of bricks, Levelling, laying & filling the intertstices with sand as per direction of EIC.
530.00
M2
150.00
79,500.00
04
220.00
RM
38.00
8,360.00
05
Sand (F.M 0.80) and khoa ( 38mm down graded) compaction (40:60) for 400mm thick sub-base in layers of 150mm maximum. Compacting and consolidating with 8 to 10 tons smooth wheel roller upto required depth. Desired leveling and camber of peripheryhas to be achieved as per drawing and direction of the Engineer-In-charge.
200.00
M3
1875.00
375,000.00
06A
0.00
M2
390.00
0.00
06B
0.00
M2
375.00
0.00
06C
0.00
M2
245.00
0.00
06D
0.00
RM
817.00
0.00
06E
Turfing
0.00
M2
20.00
0.00
06F
0.00
M3
410.00
0.00
Total: