BOQ (Press Item for Analysis)

BOQ for CC Block/Casting Warehouse N & N-E Area
Item Description Quantity Unit Rate(Tk) Amount(Tk)
01A
CC Ramp Dismatling
100.00
M2
40.00
4,000.00
01B
Dismatling Brck Wall - 125mm Thick
20.00
M2
55.00
1,100.00
02
45.00
M3
86.00
3,870.00
03
Supplying and laying of filling sand having minimum F.M. 0.80 over the compacted earth surface in 150mm layers including leveling watering consolidating each layer upto finished level as per Direction of the EIC.
100.00
M3
385.00
38,500.00
04
Single layer (3") 1st class ordinary brick flat soling in floor and other places where necessary including sorting and soaking of bricks, Levelling, laying & filling the intertstices with sand as per direction of EIC.
30.00
M2
145.00
4,350.00
05
Supplying and laying of single layer polythene sheet weighing one Kilogram per 6.5 square metre (min. 0.05 mm thick) in floor and foundation above the brick flat soling all complete as per direction of Engineer-in-charge.
80.00
M2
12.00
960.00
06
Drain
3.00
M3
7000.00
21,000.00
07
Supplying, fitting fixing pre-cast C.C (1:1.5:3) Block (450x450x50) from finish C.C. block (In using expanded wire metal sheet of block) including all complete as per drawing and the direction of EIC.
290.00
M2
480.00
139,200.00
08
80.00
M2
250.00
20,000.00
09A
5.00
NO
5000.00
25,000.00
09B
10.00
NO.
3500.00
35,000.00
10
15.00
NO.
1000.00
15,000.00
10A
0.00
NO.
1500.00
0.00
11
50.00
RM
775.00
38,750.00
12
150 mm dia R.C.C pipe line with proper slope and joint around the pipe including brick soling , earth cutting and back filling etc all complete as per direction of the EIC.
40.00
RM
350.00
14,000.00
13B
0.00
M2
375.00
0.00
13D
0.00
RM
225.00
0.00
13E
0.00
RM
90.00
0.00
13F
Minimum 12 mm thick cement plaster (1:4) to wall maintaining sharp angle at corners, joints, kobla etc. with steel trowel finish including supplying of all materials, sand screening, curing for minimum 10 days.
0.00
M2
90.00
0.00
13G
Weather coat painting of best quality & approved colour to outside walls and other places where necessary over a coat of primer after cleaning, sand papering the surface as per manufacturer,s specification all complete as per direction of the EIC.
0.00
M2
95.00
0.00
Total:
360,730.00