2nd Floor at Solid Track-II
Bill Cost
Actual Cost
Profit
Offer12345: Total : Tk.1,326,678 Material
0
0
0.00 %
Purchase : Total : Tk.837,225 Labour
0
0
0.00%
Bill123456: Total : Tk.0 Equipment
0
0
0.00%
Certify123: Total : Tk.0 Other
0
0
0.00 %
Pay 12345: Total : Tk.0 Overhead
0
0
0.00 %
oh: 2.5% Profit:8.0% vat:4.0% it:4.5 % Total Profit =nan% Total
0
0
nan %
Photograph Taken : Start : Finish :0.00%
Code
Item
Unit
BOQ Qty
Bill Qty
Actual Qty
Supp Qty
BOQ Rate
Actual Rate
BOQ Cost
Bill Cost
Actual Cost
Materials-Civil
A103 Sand - Local - Mymensingh
0
0
0
0
13.00
0.00
0
0
0
A105 Cement
0
0
0
0
300.00
0.00
0
0
0
A106 Sand - Sylhet
0
0
0
0
22.25
0.00
0
0
0
A107 Stone-chips
0
0
0
0
70.00
0.00
0
0
0
A112 GI Wire
0
0
0
0
70.00
0.00
0
0
0
A114 Re-bar G60
0
0
0
0
40.00
0.00
0
0
0
 
Total
0
0
0
Equipment-Civil
E102 Mixer m/c and vibrator
0
0
0
0
5.00
0.00
0
0
0
E103 Mini Dumper
0
0
0
0
2.00
0.00
0
0
0
E126 M/C-Vibrator,S-structure
0
0
0
0
5.00
0.00
0
0
0
 
Total
0
0
0
Labour - Civil
L001 Re-bar Work
0
0
0
0
1.65
0.00
0
0
0
L002 Formwork upto 10ft from P
0
0
0
0
8.00
0.00
0
0
0
L004 Ordinary Labour Supply
0
0
0
0
100.00
0.00
0
0
0
L012 RCC Casting-Superstructur
0
0
0
0
10.00
0.00
0
0
0
L024 FormWork:31-45ft from PL
0
0
0
0
6.00
0.00
0
0
0
L025 FormWork:24-33ft from PL
0
0
0
0
10.00
0.00
0
0
0
L060 RCC Casting-Substructure
0
0
0
0
6.00
0.00
0
0
0
 
Total
0
0
0
Misc.-Civil
M102 Steel Forms
0
0
0
0
5.00
0.00
0
0
0
M106 Steel Scaffolding
0
0
0
0
100.00
0.00
0
0
0
M123 Steel pipe with B-plate
0
0
0
0
11.00
0.00
0
0
0
M125 B-plate with pipe
0
0
0
0
16.00
0.00
0
0
0
M126 Wood shutter-3time
0
0
0
0
350.00
0.00
0
0
0
M128 Steel beam,S-structure
0
0
0
0
40.00
0.00
0
0
0
M153 Hessain cloth
0
0
0
0
1.00
0.00
0
0
0
 
Total
0
0
0
 
Total(1)
0
0
0
Add Overhead on Total(1)
2.5 %
0
0
Total(2)
0
0
Add Profit on Total(2)
8.0 %
0
0
Total(3)
0
0
Add vat on Total Cost
4.0 %
0
0
Add Income Tax on Total Cost
4.5 %
0
0
Total Cost
0
0