Brick wall and Fencing for Boundary wall |
Bill Cost |
Actual Cost |
Profit |
|
Offer12345: |
Total : Tk.5,244,350 |
Material |
0
|
0 |
0.00
% |
Purchase : |
Total : Tk.0 |
Labour |
0 |
0 |
0.00%
|
Bill123456: |
Total : Tk.0 |
Equipment |
0 |
0 |
0.00%
|
Certify123: |
Total : Tk.0 |
Other |
0 |
0 |
0.00
% |
Pay 12345: |
Total : Tk.0 |
Overhead |
0 |
0 |
0.00
% |
oh: 3.0% Profit:8.0%
vat:4.5% it:0.0 % |
Total Profit =nan% |
Total |
0 |
0 |
nan
% |
Photograph Taken : |
Start : |
Finish :nan% |
Code |
Item |
Unit |
BOQ Qty |
Bill Qty |
Actual Qty |
Supp Qty |
BOQ Rate |
Actual Rate |
BOQ Cost |
Bill Cost |
Actual Cost |
Materials-Civil |
A103 |
Sand - Local - Mymensingh |
|
0
|
0
|
0
|
0
|
12.00
|
0.00
|
0
|
0
|
0
|
A105 |
Cement |
|
0
|
0
|
0
|
0
|
295.00
|
0.00
|
0
|
0
|
0
|
A106 |
Sand - Sylhet |
|
0
|
0
|
0
|
0
|
24.00
|
0.00
|
0
|
0
|
0
|
A107 |
Stone-chips |
|
0
|
0
|
0
|
0
|
72.00
|
0.00
|
0
|
0
|
0
|
A109 |
Re-bar - G40 |
|
0
|
0
|
0
|
0
|
38.50
|
0.00
|
0
|
0
|
0
|
A112 |
GI Wire |
|
0
|
0
|
0
|
0
|
90.00
|
0.00
|
0
|
0
|
0
|
A114 |
Re-bar G60 |
|
0
|
0
|
0
|
0
|
40.50
|
0.00
|
0
|
0
|
0
|
A126 |
Ceramic Brick 10-Hole |
|
0
|
0
|
0
|
0
|
6.80
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Material-Paint |
A301 |
Ind. Enamel paint |
|
0
|
0
|
0
|
0
|
210.00
|
0.00
|
0
|
0
|
0
|
A304 |
Plastron Sealer |
|
0
|
0
|
0
|
0
|
160.00
|
0.00
|
0
|
0
|
0
|
A306 |
Enamel paint |
|
0
|
0
|
0
|
0
|
170.00
|
0.00
|
0
|
0
|
0
|
A307 |
Snowcel |
|
0
|
0
|
0
|
0
|
7.60
|
0.00
|
0
|
0
|
0
|
A308 |
Thinner-T6/T7 |
|
0
|
0
|
0
|
0
|
46.00
|
0.00
|
0
|
0
|
0
|
A310 |
Weather Coat (ColorBank) |
|
0
|
0
|
0
|
0
|
227.85
|
0.00
|
0
|
0
|
0
|
A314 |
Industrial Primer(Enamel) |
|
0
|
0
|
0
|
0
|
210.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Steel Structures |
C149 |
Hollow box (75x75x4.5mm) |
|
0
|
0
|
0
|
0
|
322.00
|
0.00
|
0
|
0
|
0
|
C150 |
Hollow box (50x50x3mm) |
|
0
|
0
|
0
|
0
|
147.00
|
0.00
|
0
|
0
|
0
|
C154 |
Hollow Met (25x25x2.3mm) |
|
0
|
0
|
0
|
0
|
59.00
|
0.00
|
0
|
0
|
0
|
C155 |
75x75x5mm MS Plate |
|
0
|
0
|
0
|
0
|
110.00
|
0.00
|
0
|
0
|
0
|
C156 |
75x75x5mm plate fitting |
|
0
|
0
|
0
|
0
|
20.00
|
0.00
|
0
|
0
|
0
|
C157 |
Metal Cap |
|
0
|
0
|
0
|
0
|
50.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Equipment-Civil |
E102 |
Mixer m/c and vibrator |
|
0
|
0
|
0
|
0
|
5.00
|
0.00
|
0
|
0
|
0
|
E103 |
Mini Dumper |
|
0
|
0
|
0
|
0
|
1.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Labour - Civil |
L000 |
Form work Foot-col-Str |
|
0
|
0
|
0
|
0
|
6.00
|
0.00
|
0
|
0
|
0
|
L001 |
Re-bar Work |
|
0
|
0
|
0
|
0
|
1.65
|
0.00
|
0
|
0
|
0
|
L014 |
Local carrying Rod |
|
0
|
0
|
0
|
0
|
0.25
|
0.00
|
0
|
0
|
0
|
L016 |
RCC Casting. |
|
0
|
0
|
0
|
0
|
6.00
|
0.00
|
0
|
0
|
0
|
L066 |
Flush pointing (1:2) |
|
0
|
0
|
0
|
0
|
3.00
|
0.00
|
0
|
0
|
0
|
L080 |
Enamel paint-Boundary |
|
0
|
0
|
0
|
0
|
5.00
|
0.00
|
0
|
0
|
0
|
L081 |
Ceramic 10-Hole B/W |
|
0
|
0
|
0
|
0
|
10.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Labour Paints |
L602 |
Weather coat painting |
|
0
|
0
|
0
|
0
|
4.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Misc.-Civil |
M102 |
Steel Forms |
|
0
|
0
|
0
|
0
|
5.00
|
0.00
|
0
|
0
|
0
|
M106 |
Steel Scaffolding |
|
0
|
0
|
0
|
0
|
100.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
Alum,SS/MS,FalseCeil |
S220 |
Hollow Metal Fenc mak/fix |
|
0
|
0
|
0
|
0
|
50.00
|
0.00
|
0
|
0
|
0
|
|
Total |
0
|
0
|
0
|
|
Total(1) |
0
|
0
|
0
|
|
Add Overhead on Total(1) |
3.0 % |
0
|
0
|
|
Total(2) |
0
|
0
|
|
Add Profit on Total(2) |
8.0 % |
0
|
0
|
|
Total(3) |
0
|
0
|
|
Add vat on Total Cost |
4.5 % |
0
|
0
|
|
Add Income Tax on Total
Cost |
0.0 % |
0
|
0
|
|
Total Cost |
0
|
0
|