ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
S1 | Sub-contractor-Civil | ||
Code | Item | Unit | Rate(Tk.) |
S101 | Epoxy paint to ceiling | sft | 34.00 |
S102 | Ceramic design tiles | sft | 150.00 |
S103 | Plastic-Weather paint | sft | 10.00 |
S104 | Painting to MS angle | sft | 6.00 |
S105 | Painting to MS Pipe | sft | 6.00 |
S106 | Paiting to old Fencing | sft | 8.00 |
S107 | Painting to A-Gate | sft | 10.00 |
S108 | Painting to MS surface | sft | 5.00 |
S109 | Weather Coat paint | sft | 11.00 |
S110 | Duc-paint with herdr. set | sft | 75.00 |
S112 | Turfing | sft | 3.00 |
S113 | Plastic Door (875) | no. | 3500.00 |
S114 | Flush Door i/c Glass | no. | 4500.00 |
S115 | Door Closure | no. | 2300.00 |
S116 | Sale of Old Office | no. | -80000.00 |
S117 | Hard board Ceiling | sft | 30.00 |
S118 | Plaster | sft | 13.00 |
S119 | Epoxy paint wall-Flr | sft | 28.00 |
S120 | Plaster work-1 | sft | 11.00 |
S121 | RCC column | cft | 180.00 |
S122 | Site Office/ Storage | sft | 100.00 |
S123 | Labour Shed | sft | 75.00 |
S124 | Toilet Facility | LS | 10000.00 |
S125 | Electricity | LS | 7500.00 |
S126 | Green Hardonit 10kg/m2 | sft | 63.20 |
S127 | Bitumin Mastic | rft | 30.00 |
S128 | Insitu Pile Boring-500mm | rft | 365.75 |
S129 | MS Grill Paiting | sft | 10.00 |
S130 | Insitu Pile Boring-450mm | rft | 250.00 |
S131 | French Polishing | sft | 50.00 |
S132 | Enamel Painting -MS Dr/An | sft | 15.00 |
S133 | Snowcem | sft | 9.00 |
S134 | Planning and Design | LS | 99999.99 |
S135 | Foundation,Padesta,GB | sft | 241.00 |
S136 | Pile,Cap,Padestal,GB | sft | 528.00 |
S137 | SS Hand Rail | rft | 2200.00 |
S138 | Sanitary | sft | 500.00 |
S139 | Precast Pile(300x300) Drv | rft | 250.00 |
S140 | Load Test | LS | 99999.99 |
S141 | Barbed Wire Fencing1 | rft | 2000.00 |
S142 | Static Load Test 125t 2-c | no. | 99999.99 |
S143 | Renovation of Old Buildin | sft | 400.00 |
S144 | Insitu Boring-600mm dia | rft | 2000.00 |
S145 | Disposal of Excavated Soi | cft | 7.00 |
S146 | Removal of Excavated Soil | cft | 7.00 |
S147 | Green Hardonite 8kg/m2 | sft | 50.00 |
S148 | 12mm dia 6inc nail epoxy | no. | 500.00 |
S149 | Steel Scaffolding | sft | 300.00 |
S150 | Integrity Test- Shore Pil | no. | 2000.00 |
S151 | Hardener Masrtertop5kg/m2 | sft | 55.00 |
S152 | Anti Termite Treatment | sft | 1.50 |
S153 | Soil Carrying | cft | 3.00 |
S154 | Precast Pile 350x350 Dtri | rft | 500.00 |
S155 | Pile Integrity Test | no. | 1500.00 |
S156 | Bituminous Paint Fosrok | sft | 41.00 |
S157 | Oil resistant Epoxy Fosro | sft | 73.50 |
S158 | Load Test-Static,Tension | no. | 99999.99 |
S159 | Load Test-Static,Compress | no. | 99999.99 |
S160 | Load Test Static, Lateral | no. | 99999.99 |
S161 | Removal of Tobacco Rubbis | cft | 7.00 |
S162 | BASF Mastertop-33,60sft/l | sft | 25.00 |
S163 | Generator Room | sft | 750.00 |
S164 | Water Proofing-1mm Felt | sft | 40.00 |
S165 | Water Prf-1.5mm Bit.Felt | sft | 70.00 |
S166 | Water-Prf-1.5mm Imperseal | sft | 70.00 |
S167 | Concrete Core Cutting | cft | 3000.00 |
S168 | Micro Concrete Supply | cft | 3000.00 |
S169 | Demobilization | sft | 10.00 |
S170 | Insitu Pile Boring-400mm | rft | 145.00 |
S171 | Mat. Carrying by Labor | no | 250.00 |
S172 | Penalty Money | each | -80000.00 |
S173 | Concrete-PWD-07.6.1.1 | cft | 298.06 |
S174 | Steel Form-PWD-07.6.1.2 | sft | 35.49 |
S175 | Sand Piling-200mm | rft | 45.00 |
S176 | Insitu Pile Boring1-450mm | Rft | 170.00 |
S177 | Addition Work | Rft | 5.00 |
S178 | Deduct Mud Remove | LS | -5000.00 |
S179 | 500mm D Boring N Casting | RM | 700.00 |
S180 | Subbase (Koha:Sand=2:1) | cft | 80.00 |
S181 | Brick Flat Soling-75mm | sft | 20.00 |
S182 | Brick on Edging i/c mater | sft | 25.00 |
S183 | HBB i/c material | sft | 35.00 |
S184 | SS Stair/ CorridorRailing | kg | 250.00 |
S185 | Pile Boring-Hydraulic-450 | rft | 855.00 |
S186 | Insitu Pile Boring-800mm | rft | 1400.00 |
S187 | Insitu Boring-600mm dia1 | rft | 500.00 |
S188 | Removal of Girth | cft | 10.00 |
S189 | Material Carry from Ghat | LS | 66250.00 |
S190 | Making Raised Platform | sft | 40.00 |
S191 | Making Temporary School | sft | 100.00 |
S192 | Pile Boring-Hydraulic-600 | rft | 1200.00 |
S193 | Pile Boring-Hydraulic-400 | rft | 1000.00 |
S194 | Pile Boring-Transmiss-650 | rft | 550.00 |
S195 | Gardening with Apron | sft | 225.00 |
S196 | Dismantling Sub-station | sft | 80.00 |