ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
M1 | Misc.-Civil | ||
Code | Item | Unit | Rate(Tk.) |
M101 | Forms PC Block(450x450) | no. | 5.00 |
M102 | Steel Forms-Rect- | sft | 50.00 |
M103 | Nut Bolt-use 30 time | kg | 4.50 |
M104 | Aica for Polythene | sft | 0.20 |
M105 | Shoring for Excavation | sft | 30.00 |
M106 | Scaffolding-use 80 times | set | 120.00 |
M107 | Covering for CI Sheet Rem | sft | 2.00 |
M108 | Stone Cutting Disk-100 | no. | 70.00 |
M109 | Welding Electrode VM 8-no | pack | 750.00 |
M110 | Bentonite | kg | 30.00 |
M111 | Pile Shutter (steel) | sft | 12.00 |
M112 | Cost of Pre-casr yard | rft | 8.00 |
M113 | Local carring - Cement | bag | 1.00 |
M114 | Grinding Disk-175 | no. | 0.00 |
M115 | Stome-chips screening | cft | 1.00 |
M116 | Hardware materials | LS | 140.00 |
M117 | Site Truss Work-Labour | LS | 1600.00 |
M118 | Site Truss Work-Material | LS | 0.00 |
M119 | Preparation of result | LS | 3000.00 |
M120 | Diamond cuting disk-175mm | no. | 1450.00 |
M121 | Shoring for pile E-Cuttin | sft | 50.00 |
M122 | Steel shutter use-piling | sft | 20.00 |
M123 | Steel pipe with B-plate | no | 11.00 |
M124 | wood use 5-time-Garjan | cft | 850.00 |
M125 | B-plate with pipe | no | 16.00 |
M126 | Wood shutter-3time | cft | 450.00 |
M127 | Steel form,S-structure | sft | 10.00 |
M128 | Steel beam,S-structure | no | 40.00 |
M129 | Stone Cutting Disc - 175 | no | 70.00 |
M130 | Diamond Cuting Disc- 175 | no | 2200.00 |
M131 | Diamond Cutiing Disc -100 | no | 600.00 |
M132 | Wood use-6time mango | cft | 108.00 |
M133 | Cheisel - Hammer | no | 55.00 |
M134 | CI grating fitting | no | 300.00 |
M135 | 300x300mm Punch | no | 1500.00 |
M136 | 300x300x150 Rcc Upstand | no | 10000.00 |
M137 | Grinding Disk-100 | no. | 65.00 |
M138 | Steel Shutter use 18 time | sft | 18.00 |
M139 | Steel shutter 20-time | sft | 20.00 |
M140 | Steel shutter-New | sft | 30.00 |
M141 | Form work with angle/flat | sft | 10.00 |
M142 | Cost for Support-Footing | LS | 150.00 |
M143 | Mobilization-Rig | LS | 20500.00 |
M144 | Trailer for Mobilization | trip | 3000.00 |
M145 | Crane for Loading | day | 5000.00 |
M146 | Labour Loading-Rigman | day | 150.00 |
M147 | Crane for Unloading | day | 5000.00 |
M148 | Labour Unload-Rigman | day | 150.00 |
M149 | Dismantling(15nsx10day) | mday | 120.00 |
M150 | Plastocerte Plus | kg | 160.00 |
M151 | Sika Top(R) Seal - 107 | kg | 155.00 |
M152 | Cork Sheet-12mm | sft | 3.50 |
M153 | Hessain cloth | sft | 1.00 |
M154 | Bolt Carrying | no | 12.50 |
M155 | Welding rod 10-no | Pack | 320.00 |
M156 | LP Gas | cyl | 570.00 |
M157 | Oxygen | Cyl | 340.00 |
M158 | Sal Bollah-10ft | no. | 210.00 |
M159 | Carrying L.s | L.s | 2000.00 |
M160 | Form oil,Grinding Disk et | sft | 1.00 |
M161 | Rigman for Erection | day | 150.00 |
M162 | Shutter-Rent/ Used | sft | 35.00 |
M163 | Coaltaring 2 coats | sft | 5.00 |
M164 | Door Clamp | no. | 100.00 |
M165 | Iron Tower Bolt-1 ft long | no. | 200.00 |
M166 | Socket Bolt - 8 inch | no. | 200.00 |
M167 | Hinge 4 inch | no. | 120.00 |
M168 | Nickel Plate Handle | no. | 100.00 |
M169 | Iron screw | dozn | 60.00 |
M170 | Higed cleat, buffer block | set | 200.00 |
M171 | Layout and Survey-Small A | sft | 0.60 |
M172 | Welding Cost-Anchor Bolt | set | 100.00 |
M173 | PVC Pipe Thread Tape Gree | kg | 10.00 |
M174 | Turn Buckle-use 50 time | no. | 12.00 |
M178 | Steel Round Shutter | sft | 100.00 |
M179 | Peacon, Tie Rod, PVC pipe | sft | 35.00 |
M180 | Laboratory Soli Compactio | no. | 5000.00 |
M181 | Laboratory - Rebar Test | no. | 5000.00 |
M182 | Laboratory-Concrete Cylin | no. | 3000.00 |
M183 | Chiesel/ Hammer | cft | 12.00 |
M184 | Wooden Form-TB/Lintel | sft | 16.00 |
M185 | Wooden Form-Slab | sft | 18.00 |
M186 | Bituminous coating | sft | 10.00 |
M187 | Shoring/Dewatering | cft | 3.00 |
M188 | Decking Shutter-Waterprof | sft | 30.00 |
M189 | Site Protection | sft | 15.00 |
M190 | Steel Shutter for PC Slab | sft | 1.00 |
M191 | Steel Shutter for Pile | sft | 40.00 |
M192 | Butter fly Key for B/W | no. | 0.00 |
M193 | Point Welding | poin | 2.50 |
M194 | Joint Welding | inch | 6.00 |
M195 | Steel Shuttter-Pilinth | sft | 40.00 |
M196 | Steel Shutter-Tie, Lintel | sft | 25.00 |
M197 | Steel Shutter-Wall, Cone | sft | 30.00 |
M198 | Nail Gozal Wire | kg | 150.00 |
M199 | Sal Bolla-12ft | no. | 3000.00 |
M1A0 | Water and Electricity | LS | 99999.99 |
M1A1 | Compaction Test | cft | 0.50 |
M1A2 | Pile Shoe | no. | 1000.00 |
M1A3 | Plywood Shutter use 3 tim | sft | 100.00 |
M1A4 | Shoring for Concrete Stru | cft | 25.00 |
M1A5 | Hinge, Pad Lock,Bolt etc. | LS | 10000.00 |
M1A6 | Hinge, Bolt etc | ls | 3000.00 |
M1A7 | Galvaizing | kg | 15.00 |
M1A8 | Steel Props-use 50 time | no. | 50.00 |
M1A9 | MS Pipe-50 mm | rft | 20.00 |
M1B1 | Pea-Cone | no. | 225.00 |
M1B2 | Tie Rod | no. | 75.00 |
M1B3 | Over Head Drain Shutter | sft | 60.00 |
M1B4 | MS Nuts | pcs | 5.00 |
M1B5 | Shutter Grinding and Oili | sft | 10.00 |
M1B6 | MS Box-100x100 use 40 tim | rft | 7.50 |
M1B8 | Layout and Survey-Large A | sft | 0.07 |
M1B9 | Soil Test-20~24M | no. | 8000.00 |
M1C0 | Bamboo | no. | 350.00 |
M1C1 | CI Sheet-.045mm | bund | 5500.00 |
M1C2 | Maretial Carrying | truc | 5000.00 |
M1C3 | GI Wire for fencing | kg | 115.00 |
M1C4 | Staging for Tile Work | sft | 8.00 |
M1C5 | Material Carrying | cft | 5.00 |
M1C6 | Safety Net on Scaffolding | sft | 300.00 |
M1C7 | Safety Belt | NO. | 3000.00 |
M1C8 | U Nail-6mm | no. | 15.00 |
M1C9 | Wooden Shutter | sft | 10.00 |
M1D0 | Cork-sheet-25mm | sft | 10.00 |
M1D1 | Curing etc. | cft | 3.00 |
M1D2 | Lab Test-Concrete | cft | 1.00 |
M1D3 | Unipaver-222x1100x100 Car | no. | 18.00 |
M1D4 | Fire Wood | Mnds | 210.00 |
M1D5 | Demolition Dining Shed | LS | 99999.99 |
M1D6 | Rubbish Removal | LS | 47500.00 |
M1D7 | Digital Survey-Medium | LS | 0.55 |
M1D8 | Mango Wood for Shuttering | cft | 450.00 |
M1D9 | Mastic Bitumin Seal Fill | rft | 110.00 |
M1E0 | Shore Protection-Steel Jo | LS | 99999.99 |
M1E1 | Mobilization-Demobilizati | LS | 99999.99 |
M1E2 | Layout Survey-Total Statn | day | 10000.00 |
M1E3 | Hotel Rent | day | 500.00 |
M1E4 | Steel Form-Block-use 40t | sft | 1.50 |
M1E5 | Cost of Signboard | sft | 225.00 |
M1E6 | Re-bar Cemical Bond-RCC | no. | 10000.00 |
M1E7 | Land Rent | sft | 0.55 |
M1E8 | Sundries and Incidental | LS | 600.00 |
M1E9 | Electricity Cost | rft | 0.50 |
M1F0 | Line Welding | inch | 6.00 |
M1F1 | Form-PSC I Girder-80% | sum | 15940.00 |
M1F2 | Lab-PSC-Girder, Slab-2% | sum | 717.31 |
M1F3 | HT Strand-Grout,Erect-25% | sum | 47120.31 |
M1F4 | HT Strand-Equipment-25% | sum | 47120.31 |
M1F5 | HT Strand-Lab-2% | sum | 5654.44 |
M1F6 | Forms-G-25-Slab-Beam-60% | sum | 7093.01 |
M1F7 | Lab-RCC-Slab,XGirdG-25-2% | sum | 378.29 |
M1F8 | Forms-Stair-30% | sum | 6830.80 |
M1F9 | Lab-RCC-Stair-C-35-2% | sum | 592.00 |
M1G0 | Forms-G-30-Column-50% | sum | 6087.42 |
M1G1 | Lab-RCC-Slab-C-30-2% | sum | 365.25 |
M1G2 | Forms-RCC-Footing-C-30-6% | sum | 730.49 |
M1G3 | Lab-RCC-Footing-C-30-2% | sum | 258.11 |
M1G4 | Forms-RCC-Column-C-30-50% | sum | 6357.41 |
M1G5 | Lab-RCC-Column-C-30-2% | sum | 370.64 |
M1G6 | CAPWAP Software Ana-300T | sum | 18578.50 |
M1G7 | Lab-PDA Test-100-300T | sum | 3125.50 |
M1G8 | CAPWAP Software Ana-100T | sum | 8528.25 |
M1G9 | Lab-PDA Test-100-100T | sum | 1450.50 |
M1H0 | Bentonit Slury Tank-400mm | sum | 107.80 |
M1H1 | Lab-Pile Boring-400mm dia | sum | 23.70 |
M1H2 | Bentonite Slury Tank-600m | sum | 182.00 |
M1H3 | Lab-Pile Boring-600mm | sum | 40.00 |
M1H4 | Tools-Rubbish Removal | sum | 1733.33 |
M1H5 | Tools n P, Local Carriage | sum | 162.00 |
M1H6 | Providing Pile Point | no. | 5000.00 |
M1H7 | Stub Setting | each | 10000.00 |
M1H8 | Steel Shutter-use 10 time | sft | 80.00 |
M1H9 | Transmission Line-Add Cos | towr | 99999.99 |
M1J0 | Design | sft | 2.00 |
M1J1 | Design Approval | sum | 99999.99 |