ITEM RATE
Click on Code to see the Shedule Items or Go Home
M1 Misc.-Civil
Code Item Unit Rate(Tk.)
M101 Forms PC Block(450x450) no.
5.00
M102 Steel Forms-Rect- sft
50.00
M103 Nut Bolt-use 30 time kg
4.50
M104 Aica for Polythene sft
0.20
M105 Shoring for Excavation sft
30.00
M106 Scaffolding-use 80 times set
120.00
M107 Covering for CI Sheet Rem sft
2.00
M108 Stone Cutting Disk-100 no.
70.00
M109 Welding Electrode VM 8-no pack
750.00
M110 Bentonite kg
30.00
M111 Pile Shutter (steel) sft
12.00
M112 Cost of Pre-casr yard rft
8.00
M113 Local carring - Cement bag
1.00
M114 Grinding Disk-175 no.
0.00
M115 Stome-chips screening cft
1.00
M116 Hardware materials LS
140.00
M117 Site Truss Work-Labour LS
1600.00
M118 Site Truss Work-Material LS
0.00
M119 Preparation of result LS
3000.00
M120 Diamond cuting disk-175mm no.
1450.00
M121 Shoring for pile E-Cuttin sft
50.00
M122 Steel shutter use-piling sft
20.00
M123 Steel pipe with B-plate no
11.00
M124 wood use 5-time-Garjan cft
850.00
M125 B-plate with pipe no
16.00
M126 Wood shutter-3time cft
450.00
M127 Steel form,S-structure sft
10.00
M128 Steel beam,S-structure no
40.00
M129 Stone Cutting Disc - 175 no
70.00
M130 Diamond Cuting Disc- 175 no
2200.00
M131 Diamond Cutiing Disc -100 no
600.00
M132 Wood use-6time mango cft
108.00
M133 Cheisel - Hammer no
55.00
M134 CI grating fitting no
300.00
M135 300x300mm Punch no
1500.00
M136 300x300x150 Rcc Upstand no
10000.00
M137 Grinding Disk-100 no.
65.00
M138 Steel Shutter use 18 time sft
18.00
M139 Steel shutter 20-time sft
20.00
M140 Steel shutter-New sft
30.00
M141 Form work with angle/flat sft
10.00
M142 Cost for Support-Footing LS
150.00
M143 Mobilization-Rig LS
20500.00
M144 Trailer for Mobilization trip
3000.00
M145 Crane for Loading day
5000.00
M146 Labour Loading-Rigman day
150.00
M147 Crane for Unloading day
5000.00
M148 Labour Unload-Rigman day
150.00
M149 Dismantling(15nsx10day) mday
120.00
M150 Plastocerte Plus kg
160.00
M151 Sika Top(R) Seal - 107 kg
155.00
M152 Cork Sheet-12mm sft
3.50
M153 Hessain cloth sft
1.00
M154 Bolt Carrying no
12.50
M155 Welding rod 10-no Pack
320.00
M156 LP Gas cyl
570.00
M157 Oxygen Cyl
340.00
M158 Sal Bollah-10ft no.
210.00
M159 Carrying L.s L.s
2000.00
M160 Form oil,Grinding Disk et sft
1.00
M161 Rigman for Erection day
150.00
M162 Shutter-Rent/ Used sft
35.00
M163 Coaltaring 2 coats sft
5.00
M164 Door Clamp no.
100.00
M165 Iron Tower Bolt-1 ft long no.
200.00
M166 Socket Bolt - 8 inch no.
200.00
M167 Hinge 4 inch no.
120.00
M168 Nickel Plate Handle no.
100.00
M169 Iron screw dozn
60.00
M170 Higed cleat, buffer block set
200.00
M171 Layout and Survey-Small A sft
0.60
M172 Welding Cost-Anchor Bolt set
100.00
M173 PVC Pipe Thread Tape Gree kg
10.00
M174 Turn Buckle-use 50 time no.
12.00
M178 Steel Round Shutter sft
100.00
M179 Peacon, Tie Rod, PVC pipe sft
35.00
M180 Laboratory Soli Compactio no.
5000.00
M181 Laboratory - Rebar Test no.
5000.00
M182 Laboratory-Concrete Cylin no.
3000.00
M183 Chiesel/ Hammer cft
12.00
M184 Wooden Form-TB/Lintel sft
16.00
M185 Wooden Form-Slab sft
18.00
M186 Bituminous coating sft
10.00
M187 Shoring/Dewatering cft
3.00
M188 Decking Shutter-Waterprof sft
30.00
M189 Site Protection sft
15.00
M190 Steel Shutter for PC Slab sft
1.00
M191 Steel Shutter for Pile sft
40.00
M192 Butter fly Key for B/W no.
0.00
M193 Point Welding poin
2.50
M194 Joint Welding inch
6.00
M195 Steel Shuttter-Pilinth sft
40.00
M196 Steel Shutter-Tie, Lintel sft
25.00
M197 Steel Shutter-Wall, Cone sft
30.00
M198 Nail Gozal Wire kg
150.00
M199 Sal Bolla-12ft no.
3000.00
M1A0 Water and Electricity LS
99999.99
M1A1 Compaction Test cft
0.50
M1A2 Pile Shoe no.
1000.00
M1A3 Plywood Shutter use 3 tim sft
100.00
M1A4 Shoring for Concrete Stru cft
25.00
M1A5 Hinge, Pad Lock,Bolt etc. LS
10000.00
M1A6 Hinge, Bolt etc ls
3000.00
M1A7 Galvaizing kg
15.00
M1A8 Steel Props-use 50 time no.
50.00
M1A9 MS Pipe-50 mm rft
20.00
M1B1 Pea-Cone no.
225.00
M1B2 Tie Rod no.
75.00
M1B3 Over Head Drain Shutter sft
60.00
M1B4 MS Nuts pcs
5.00
M1B5 Shutter Grinding and Oili sft
10.00
M1B6 MS Box-100x100 use 40 tim rft
7.50
M1B8 Layout and Survey-Large A sft
0.07
M1B9 Soil Test-20~24M no.
8000.00
M1C0 Bamboo no.
350.00
M1C1 CI Sheet-.045mm bund
5500.00
M1C2 Maretial Carrying truc
5000.00
M1C3 GI Wire for fencing kg
115.00
M1C4 Staging for Tile Work sft
8.00
M1C5 Material Carrying cft
5.00
M1C6 Safety Net on Scaffolding sft
300.00
M1C7 Safety Belt NO.
3000.00
M1C8 U Nail-6mm no.
15.00
M1C9 Wooden Shutter sft
10.00
M1D0 Cork-sheet-25mm sft
10.00
M1D1 Curing etc. cft
3.00
M1D2 Lab Test-Concrete cft
1.00
M1D3 Unipaver-222x1100x100 Car no.
18.00
M1D4 Fire Wood Mnds
210.00
M1D5 Demolition Dining Shed LS
99999.99
M1D6 Rubbish Removal LS
47500.00
M1D7 Digital Survey-Medium LS
0.55
M1D8 Mango Wood for Shuttering cft
450.00
M1D9 Mastic Bitumin Seal Fill rft
110.00
M1E0 Shore Protection-Steel Jo LS
99999.99
M1E1 Mobilization-Demobilizati LS
99999.99
M1E2 Layout Survey-Total Statn day
10000.00
M1E3 Hotel Rent day
500.00
M1E4 Steel Form-Block-use 40t sft
1.50
M1E5 Cost of Signboard sft
225.00
M1E6 Re-bar Cemical Bond-RCC no.
10000.00
M1E7 Land Rent sft
0.55
M1E8 Sundries and Incidental LS
600.00
M1E9 Electricity Cost rft
0.50
M1F0 Line Welding inch
6.00
M1F1 Form-PSC I Girder-80% sum
15940.00
M1F2 Lab-PSC-Girder, Slab-2% sum
717.31
M1F3 HT Strand-Grout,Erect-25% sum
47120.31
M1F4 HT Strand-Equipment-25% sum
47120.31
M1F5 HT Strand-Lab-2% sum
5654.44
M1F6 Forms-G-25-Slab-Beam-60% sum
7093.01
M1F7 Lab-RCC-Slab,XGirdG-25-2% sum
378.29
M1F8 Forms-Stair-30% sum
6830.80
M1F9 Lab-RCC-Stair-C-35-2% sum
592.00
M1G0 Forms-G-30-Column-50% sum
6087.42
M1G1 Lab-RCC-Slab-C-30-2% sum
365.25
M1G2 Forms-RCC-Footing-C-30-6% sum
730.49
M1G3 Lab-RCC-Footing-C-30-2% sum
258.11
M1G4 Forms-RCC-Column-C-30-50% sum
6357.41
M1G5 Lab-RCC-Column-C-30-2% sum
370.64
M1G6 CAPWAP Software Ana-300T sum
18578.50
M1G7 Lab-PDA Test-100-300T sum
3125.50
M1G8 CAPWAP Software Ana-100T sum
8528.25
M1G9 Lab-PDA Test-100-100T sum
1450.50
M1H0 Bentonit Slury Tank-400mm sum
107.80
M1H1 Lab-Pile Boring-400mm dia sum
23.70
M1H2 Bentonite Slury Tank-600m sum
182.00
M1H3 Lab-Pile Boring-600mm sum
40.00
M1H4 Tools-Rubbish Removal sum
1733.33
M1H5 Tools n P, Local Carriage sum
162.00
M1H6 Providing Pile Point no.
5000.00
M1H7 Stub Setting each
10000.00
M1H8 Steel Shutter-use 10 time sft
80.00
M1H9 Transmission Line-Add Cos towr
99999.99
M1J0 Design sft
2.00
M1J1 Design Approval sum
99999.99