ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
L1 | Labour-Civil | ||
Code | Item | Unit | Rate(Tk.) |
L101 | Earth Work in Excavation | cft | 12.00 |
L102 | Filling | cft | 6.00 |
L103 | Brck flat soling | sft | 5.00 |
L104 | Polythene laying | sft | 0.25 |
L105 | Dismantling RCC | cft | 100.00 |
L106 | CC (50mm) With NCF | sft | 16.00 |
L107 | CC Work | cft | 35.00 |
L108 | Brick Work-125mm | sft | 20.00 |
L109 | Plaster Work | sft | 18.00 |
L110 | Neat Cement Finishing | sft | 7.00 |
L111 | RCC Work-Substructure | cft | 40.00 |
L112 | 150mm dia RCC Pipe | rft | 25.00 |
L113 | Form work-Substructure | sft | 40.00 |
L114 | Dismantling - PC Block | sft | 2.00 |
L115 | Dismantle B/W 125 mm thk | sft | 4.00 |
L116 | Dismatle - B/W | cft | 5.00 |
L117 | Toilet Cubical fitting | sft | 20.00 |
L118 | Dismantling board,ceiling | sft | 5.00 |
L119 | Dismantle B/W 250mm thk | cft | 35.00 |
L120 | Dismantle, Door Window | sft | 3.00 |
L121 | Brick work-125mm Superstr | sft | 13.00 |
L122 | 250mm Brick work-Substruc | cft | 40.00 |
L123 | Dismantle CI Sheet | sft | 3.00 |
L124 | Dismantle Existing Store | sft | 9.50 |
L125 | Pile Boring -500mm | rft | 90.00 |
L126 | Pile casting | cft | 8.00 |
L127 | Pile Form Work | sft | 8.00 |
L128 | Pile shifting, driving | rft | 143.00 |
L129 | Re-bar work-Substructure | kg | 8.00 |
L130 | Skilled Labour | no | 800.00 |
L131 | Unskilled Labour | no | 600.00 |
L132 | Filling.loading,unloading | bag | 3.00 |
L133 | Staging unloading | LS | 500.00 |
L134 | Pile head cutting rod | no. | 200.00 |
L135 | Dismantling RCC Pile head | cft | 70.00 |
L136 | Re-bar welding | LS | 200.00 |
L137 | Dismantling of plinth pro | sft | 12.00 |
L138 | Dismantling of Tiles | sft | 10.00 |
L139 | Shutter replace | no | 500.00 |
L140 | Dismantling beam(.3x.3) | no | 1000.00 |
L141 | Stage making | No | 1650.00 |
L142 | RCC Dismantling | sft | 15.00 |
L143 | Rod welded | no | 100.00 |
L144 | Rubbish cleaning | cft | 5.00 |
L145 | Rubbish remove | no | 100.00 |
L146 | Back filling with compact | cft | 2.00 |
L147 | Pre-cast block fitting | no | 100.00 |
L148 | Co-Slab fixing at ins-pit | no | 150.00 |
L149 | Dismantling CC-BFS | sft | 3.00 |
L150 | Earth -Cutting pile cap | Cft | 8.00 |
L151 | RCC work Super-structure | cft | 40.00 |
L152 | Form work Super-structure | sft | 35.00 |
L153 | Form work beam | sft | 16.00 |
L154 | Removal Shutter | sft | 2.00 |
L155 | Re-bar work Superstructur | kg | 8.50 |
L156 | DPC work | sft | 5.00 |
L157 | Clay soil remove | cft | 1.50 |
L158 | Distle. CI sheet roofing. | sft | 11.50 |
L159 | T-Ceiling remove/Refittin | sft | 11.50 |
L160 | Sub-base | cft | 4.00 |
L161 | Brick cleaning | no | 0.60 |
L162 | Expension joint | rft | 3.00 |
L163 | Shuttering -Wall | sft | 6.00 |
L164 | Kerb making & fitting | no | 50.00 |
L165 | Paving Tiles | sft | 20.00 |
L166 | 225mm dia RCC pipe | rft | 50.00 |
L167 | 300mm dia RCC pipe | rft | 75.00 |
L168 | 450mm dia RCC pipe | rft | 100.00 |
L169 | 600mm dia RCC pipe | rft | 125.00 |
L170 | RMC-Mat | cft | 10.00 |
L171 | Plaster with NCF | sft | 4.00 |
L172 | Patent stone with NCF | sft | 25.00 |
L173 | Bitumen painting | sft | 2.00 |
L174 | HCI grating fixing | no | 800.00 |
L175 | Dismantling BFS, HBB | sft | 5.00 |
L176 | BFS with Morter joint | sft | 1.50 |
L177 | 75mm CC block | no | 35.00 |
L178 | 250mm B/Wall-Superstructu | cft | 45.00 |
L179 | Plaster Superstructure | sft | 8.00 |
L180 | Plaster O-A SFM | sft | 6.00 |
L181 | RMC-Column/ Wall | cft | 35.00 |
L182 | LC Dismantling | sft | 25.00 |
L183 | Mason | no. | 800.00 |
L184 | Site cleaning | sft | 2.00 |
L185 | Labour for E/Cutting | no | 120.00 |
L186 | Ext. Structure remove | L.s | 1750.00 |
L187 | B-Chips Making 3/4" | cft | 3.75 |
L188 | Labour for Sccafolding | no | 150.00 |
L189 | Supply of Labour | no | 300.00 |
L190 | Labour Sarder | no | 0.00 |
L191 | O.T Labour | hrs | 0.00 |
L192 | L-Carrying Sand | L.s | 0.00 |
L193 | Brick bats breaking | Truc | 0.00 |
L194 | Roller Hire Charge | days | 0.00 |
L195 | Dismantle of Rcc R-kerb | rft | 50.00 |
L196 | RCC Work in 6th floor | cft | 8.00 |
L197 | Fixing MS Window/ Grill | sft | 15.00 |
L198 | Fixing Cooaspible Gate | sft | 50.00 |
L199 | Fitting Door Shutter | sft | 35.00 |
L1A0 | RMC-Slab | cft | 30.00 |
L1A1 | Fitting Door Frame | rft | 25.00 |
L1A2 | Fitting Plastic Door | no. | 500.00 |
L1A3 | RCC os MS Slab | cft | 35.00 |
L1A4 | Re-bar Fabrication | kg | 8.50 |
L1A5 | Plaster Outside | sft | 18.00 |
L1A6 | Brick chips making- | no. | 1.00 |
L1A7 | Pointing Brick Work | cft | 75.00 |
L1A8 | Pointing Work | sft | 45.00 |
L1A9 | Dowel Bar | kg | 10.00 |
L1AA | Earthing Rod setting | no. | 15.00 |
L1AB | Patent Stone Casting-Fini | sft | 12.00 |
L1AC | Dismatle CC-75mm | sft | 32.50 |
L1AD | Painting-Inside | sft | 8.00 |
L1AE | Paiting-Outside | sft | 5.00 |
L1AF | Door Shutter-Painting,Fix | no. | 2800.00 |
L1AG | Safety Net Fixing | sft | 5.00 |
L1B0 | Steel Shuttering-Slab | sft | 35.00 |
L1B1 | Soil Stabilization | cft | 25.00 |
L1B2 | RCC in Column/ Duct/ Lint | cft | 25.00 |
L1B3 | Pile Head Breaking | cft | 120.00 |
L1B4 | Making, fixing fan hook | no. | 100.00 |
L1B5 | 125mm Brickwork with Poin | sft | 25.00 |
L1B6 | 250 Ceramic Brick Work | cft | 45.00 |
L1B7 | Conduit Laying-16mm | rft | 3.50 |
L1B8 | Conduit Laying-20mm | rft | 4.50 |
L1B9 | Filling 1000 cft | cft | 5000.00 |
L1C0 | RMC-Stair | cft | 45.00 |
L1C1 | Site Cleaning 1000sft | each | 2000.00 |
L1C2 | Dismantle CC/ Lime Concre | cft | 35.00 |
L1C3 | Dismantle Brick Work | cft | 25.00 |
L1C4 | Extra for250mm Brick Work | cft | 8.00 |
L1C5 | 125mm Brick Work | sft | 9.00 |
L1C6 | Extra for 125mm B/W super | sft | 3.00 |
L1C7 | Extra for 250 Ceramic B/w | cft | 10.00 |
L1C8 | Extra for Plaster-Super | sft | 4.00 |
L1C9 | Form work-TB/Lintel | sft | 14.00 |
L1D0 | Steel Shuttering-Mat | sft | 20.00 |
L1D1 | Formwork-Floor/ Roof Slab | sft | 14.00 |
L1D2 | Granite Fitting | sft | 110.00 |
L1D3 | Door Lock Fitting | no. | 300.00 |
L1D4 | Unskilled Labour1 | no. | 250.00 |
L1D5 | Hardonite Floor | sft | 12.00 |
L1D6 | Expansion Joint making | rft | 25.00 |
L1D7 | MS Sliding Door fixing | sft | 25.00 |
L1D8 | Road, Boundary Wall Disma | no. | 99999.99 |
L1D9 | Tree Cutting | no. | 50000.00 |
L1E0 | Steel Shuttering-BaseWall | sft | 35.00 |
L1E1 | MS Door Fitting | sft | 35.00 |
L1E2 | RCC in PC Slab-87mm | sft | 7.00 |
L1E3 | PC Slab Shuttering | sft | 13.00 |
L1E4 | Cast-in-situ Slab | sft | 10.00 |
L1E5 | Extra earth 0.5m exc 1.5m | cft | 5.00 |
L1E6 | Glass wall fixing | sft | 100.00 |
L1E7 | Brick Bond Concrete | sft | 25.00 |
L1E8 | Facing Brickwork | sft | 90.00 |
L1E9 | uPVC Dooor frame fixing | rft | 30.00 |
L1F0 | Steel Shuttering-LiftWall | sft | 35.00 |
L1F1 | uPVC Door Shutter fitting | no. | 100.00 |
L1F2 | Sand-Khoa Filling | cft | 6.00 |
L1F3 | Erection of PC slab | sft | 6.00 |
L1F4 | PVC Water Bar fitting | rft | 20.00 |
L1F5 | Drip Course1 | rft | 20.00 |
L1F6 | Non-shrink grout, shuttte | cft | 100.00 |
L1F7 | MS Gate Fixing | sft | 10.00 |
L1F8 | Stripping of Damaged Bric | sft | 15.00 |
L1F9 | Earth work in Box cutting | cft | 8.00 |
L1G0 | Steel Shuttering-Stair | sft | 30.00 |
L1G1 | HBB | sft | 10.00 |
L1G2 | Honecomb Brick Work | cft | 15.00 |
L1G3 | Making, Filling Bats | cft | 15.00 |
L1G4 | Sub-base Work/Gravel fiil | cft | 20.00 |
L1G5 | Uni-paving Blocl Laying | sft | 30.00 |
L1G6 | Kerb-stone fixing | rft | 50.00 |
L1G7 | Excavation with Excavator | cft | 6.00 |
L1G8 | Soil Disposal | cft | 8.00 |
L1G9 | 125mm Poiting Brick Work | sft | 45.00 |
L1H0 | RCC-Sunshade | cft | 35.00 |
L1H1 | Clean, Dispose Debris | cft | 5.00 |
L1H2 | Bollah Driving (12 ft) | no. | 500.00 |
L1H3 | Fixing Drum Sheet | no. | 60.00 |
L1H4 | Layout with Materials | sft | 0.00 |
L1H5 | Facing Brick Clading | sft | 40.00 |
L1H6 | 75mm Brick Work | sft | 10.00 |
L1H7 | Coarse Plastering-outside | sft | 10.00 |
L1H8 | Chipping RCC Surface | sft | 10.00 |
L1H9 | 25x6 Groove making | rft | 50.00 |
L1J1 | Fixing Rolling Shutter | nos. | 5000.00 |
L1J2 | Removing HBB | sft | 3.00 |
L1J3 | Epoxy Grout Apply | cft | 1000.00 |
L1J4 | Ladder Rung make,fix | no. | 300.00 |
L1J5 | RCC Pipe-100mm dia | rft | 30.00 |
L1J6 | RCC Pipe-1000mm dia fitti | rft | 200.00 |
L1J7 | RCC Pipe-1200mm dia fit | rft | 250.00 |
L1J8 | Levelling, Dressing | sft | 1.00 |
L1J9 | Place prxast block-300x60 | no. | 20.00 |
L1K1 | Grating Fixing | sft | 20.00 |
L1K2 | Precast Tile Laying | sft | 5.00 |
L1K3 | B-Chips making-.75" | No. | 2.00 |
L1K4 | 450mm Pile boring | rft. | 150.00 |
L1K5 | Grinding for Integrity te | no. | 150.00 |
L1K6 | Preparation for Load Test | no. | 25000.00 |
L1K7 | Ready Mix Concrete-CC | cft | 30.00 |
L1K8 | Ready Mix Concrete-Base | cft | 35.00 |
L1K9 | Ready Mix Concrete-Wall | cft | 20.00 |
L1L1 | Shuttering - Base | sft | 35.00 |
L1L2 | Shuttering-Wall | sft | 37.00 |
L1L3 | Tie Rod Cutting n Reparin | no. | 50.00 |
L1L4 | Shuttering in OverheDrain | sft | 40.00 |
L1L5 | Water Stopper Fixing | rft | 7.00 |
L1L6 | CC Work (3"/4") | Sft | 6.00 |
L1L7 | Leveling and Dresing | sft | 5.00 |
L1L8 | Sand Filling | Cft | 4.00 |
L1L9 | Brick Soling | Sft | 4.00 |
L1M0 | Material Carrying by Tru1 | Sft | 630.00 |
L1M1 | Material Carrying by Tru2 | Truc | 600.00 |
L1M2 | Materials Carrying by Tru | Truc | 650.00 |
L1M3 | Materials Carrying by Lab | Nos. | 250.00 |
L1M4 | Polymer Membrane laying | sft | 5.00 |
L1M5 | Waterproof painting | sft | 5.00 |
L1M6 | Sealant applying | rft | 15.00 |
L1M7 | Epoxy Bonding Applying | sft | 20.00 |
L1M8 | Ceramic Tile Cladding | sft | 60.00 |
L1M9 | Roof Tiles Terracing | sft | 100.00 |
L1N1 | Form Work (Upto G.B- Sup. | Sft | 38.00 |
L1N2 | CC Casting (3") | Sft. | 5.00 |
L1N3 | Form Work (1st Floor) | Sft. | 38.00 |
L1N4 | RCC Work (1st Floor) | Cft. | 22.00 |
L1N5 | Re-bar work (1st Floor) | Kg. | 4.50 |
L1N6 | Shutter Rent with Carryin | Sft. | 20.00 |
L1N7 | Cement unload, carrying | bags | 11.00 |
L1N8 | Rod unload, carrying | Ton | 600.00 |
L1N9 | Miscellanceous bill | LS | 1.00 |
L1O0 | Rod Unload | Ton | 250.00 |
L1O1 | Rod Carrying | Ton | 400.00 |
L1O2 | Door Frame Fixing | no. | 500.00 |
L1O3 | Door Shutter fixing | no. | 600.00 |
L1O4 | Hatch bolt fitting | no. | 70.00 |
L1O5 | Door Shutter Polish | sft | 50.00 |
L1O6 | Door Frame Polish | rft | 110.00 |
L1O7 | DoorViwer Panel-600x450-5 | no. | 1800.00 |
L1O8 | 250mm B/Wall -1st Floor | Cft. | 11.55 |
L1O9 | Shingle-Sand Compaction | cft | 14.25 |
L1P1 | Shingles Washing and Carr | cft | 10.00 |
L1P2 | Fixing Stair/ Ver Railing | sft | 20.00 |
L1P3 | 125mm Brick wall-1st Floo | Sft | 9.45 |
L1P4 | Plaster work-1st Floor | Sft | 8.92 |
L1P5 | 250mm Brick wall-2nd Floo | Cft | 12.10 |
L1P6 | 125mm Brick wall-2nd Floo | Sft | 9.90 |
L1P7 | Plaster work-2nd Floor | Sft | 9.35 |
L1P8 | RCC Work -2nd Floor | Cft | 24.20 |
L1P9 | Form Work-2nd Floor | Sft | 41.80 |
L1Q1 | Re-bar work -2nd Floor | Kg | 4.95 |
L1Q2 | RCC Surface Chipping | sft | 4.00 |
L1Q3 | Staging for Shutter Wo | Sft | 2.00 |
L1Q4 | Wooden Door Fitting | Nos. | 250.00 |
L1Q5 | Excavator Hire Charge | hrs. | 0.00 |
L1Q6 | Demolition-Bituminous Rd | sft | 50.00 |
L1Q7 | Demolition-Steel Structur | sft | 10.00 |
L1Q8 | Bamboo-CI Sheet Fencing | rft | 100.00 |
L1Q9 | Dismatle Plaster | sft | 10.00 |
L1R1 | Outer Walll Tile Clading | sft | 35.00 |
L1R2 | CC Work1 | sft | 10.00 |
L1R3 | Power Trowel Finishing | sft | 3.00 |
L1R4 | Lime Terracing | cft | 60.00 |
L1R5 | Readymix Concrete-Slab | cft | 20.00 |
L1R6 | Earth Carrying-60-100m | cft | 3.00 |
L1R7 | Earth Carrying-100-200m | cft | 6.00 |
L1R8 | Earth Carrying -200-300m | cft | 9.00 |
L1S0 | Earth Carrying-300m+ | cft | 12.00 |
L1S1 | Groove making in Plaster | rft | 15.00 |
L1S2 | Gwo Textile Laying | sft | 10.00 |
L1S3 | CC Work (6"/8" Thick) | Cft. | 22.00 |
L1S4 | Earth/Backfilling work | cft | 4.00 |
L1S5 | RCC Work -Mixer m/c | cft | 21.00 |
L1S6 | RCC Work (In Pond) | cft | 26.00 |
L1S7 | Formwork (upside) | sft | 24.00 |
L1S8 | Formwork (In Pond) | sft | 40.00 |
L1S9 | MS Rebar Fabrication | kg | 5.50 |
L1T0 | Layout | LS | 5000.00 |
L1T1 | CC/RCC Carrying | cft | 5.00 |
L1T2 | MS Rebar Carrying | ton | 250.00 |
L1T3 | Labour Fooding Charge | no. | 100.00 |
L1T4 | Excavator/Vaco Hire Charg | day | 10000.00 |
L1T5 | Extra Earth Cutting | cft | 5.00 |
L1T6 | Sub-Base Laying | Sft | 15.00 |
L1T7 | CC/RCC Carrying1 | cft | 3.00 |
L1T8 | Staging work in Pond | sft | 12.00 |
L1T9 | CC/RCC Carrying2 | cft | 4.00 |
L1U0 | CC (6"/8" Thick) Floor | cft | 18.00 |
L1U1 | NCF with Power Trowel | sft | 20.00 |
L1U2 | Cement Unloading | bags | 5.00 |
L1U3 | Core Drilling-75mm | no. | 500.00 |
L1U4 | Mesh Plastering | sft | 20.00 |
L1U5 | Shear Connector-8~12 | no. | 90.00 |
L1U6 | Anchor Grout-10~12 | no. | 80.00 |
L1U7 | Anchor Grout-12~14 | no. | 100.00 |
L1U8 | Anchor Grout-16~18 | no. | 120.00 |
L1U9 | Bondibg Epoxy Application | sft | 50.00 |
L1V0 | Readymix Concrete-Labour | cft | 20.00 |
L1V1 | Road Shutter Fixing | sft | 10.00 |
L1V2 | 125mm Brickwork1 | sft | 8.00 |
L1V3 | Formwork (PL to GF Slab) | sft | 27.00 |
L1V4 | RCC Work (PL to GF Slab) | cft | 23.00 |
L1V5 | Inside Carrying by Truck | nos. | 350.00 |
L1V6 | Concreting in Block | cft | 8.00 |
L1V7 | Loading and Unloading Blo | cft | 11.90 |
L1V8 | Laying Block | cft | 41.65 |
L1V9 | Cutting-Fixing Cork sheet | sft | 2.00 |
L1W0 | Levelling Dressing | sft | 3.80 |
L1W1 | Earth Excavation | Cft | 5.50 |
L1W2 | Mud Removal | Cft | 5.00 |
L1W3 | Excavator Charge | LS | 4000.00 |
L1W4 | Deduction Labor | LS | -7500.00 |
L1W5 | Non-shrink grout aplying | cft | 500.00 |
L1W6 | Soil Removal by Truck | Truc | 1500.00 |
L1W7 | Cork-sheet fixing | sft | 5.00 |
L1W8 | Hollow Block-10mm | sft | 30.00 |
L1W9 | Exacavat upto 3m 6m lead | cft | 7.50 |
L1X0 | Exacavat 3-6m, 6m lead | cft | 9.50 |
L1X1 | Expansion Joint making-fi | rft | 100.00 |
L1X2 | Gap Filling Shore Pile | sft | 175.00 |
L1X3 | Formwork-Block | sft | 5.00 |
L1X4 | Hollow Block-390x90x190 | cft | 71.35 |
L1X5 | Hollow Block-390X190X190 | CFT | 47.75 |
L1X6 | Palasiding-1050x600, 3m | rft | 30.00 |
L1X7 | Excavator Rent-Cat-5 | hour | 729.12 |
L1X8 | Excavator Carrying | trip | 9000.00 |
L1X9 | Brick-chips making-2 | no. | 0.60 |
L1Y0 | Excavator Rent-Cat-7 | hour | 916.66 |
L1Y1 | Excavator Carrying-2 | trip | 10000.00 |
L1Y2 | Block-500x500x500-Dumping | no. | 6.00 |
L1Y3 | Block-500x500x500-Laying | no. | 60.00 |
L1Y4 | Block-400x400x400-Dumping | no. | 3.15 |
L1Y5 | Block-400x400x400-Laying | no. | 16.50 |
L1Y7 | Block-450x450x300-Dumping | no. | 4.50 |
L1Y8 | Block-450x450x300-Laying | no. | 20.00 |
L1Y9 | Orinary Labour-1 | no. | 600.00 |
L1Z0 | High Yield re-bar fabrica | kg | 20.00 |
L1Z1 | PSC-Girder-Deck Slab | cft | 70.00 |
L1Z2 | H.T. Strand Fabrication | kg | 20.00 |
L1Z3 | Head Mason | no. | 1000.00 |
L1Z4 | Foreman | no. | 1000.00 |
L1Z5 | Electrician | no. | 800.00 |
L1Z6 | Technician | no. | 1200.00 |
L1Z7 | Barbed Wire Fencing-Singl | rft | 10.00 |
L1Z8 | Boundary-MS Angle Work | kg | 12.00 |
L1Z9 | Mechanical Compaction | cft | 4.00 |
L1ZA | Readymix-Head Load | cft | 15.00 |
L1ZB | Shuttering-Wood | sft | 25.50 |
L1ZC | Re-bar Work i/c GI Wire | kg | 8.00 |
L1ZD | Bailing out of Water-1 | hour | 120.00 |
L1ZE | Tin Shed making | sft | 15.00 |
L1ZF | Readymix with Pump | cft | 8.00 |
L1ZG | Steel Shuttering | dft | 31.00 |
L1ZH | Shutter Clean with Cupbru | sft | 2.25 |
L1ZI | Steel Shutter Oiling | sft | 1.50 |
L1ZK | Scaffolding-4ft | sft | 7.00 |
L1ZL | Chipping Work | sft | 3.00 |
L1ZM | CC Block-0.75-1.5 inch | no. | 0.65 |
L1ZN | CC Block-1.5-3.0inch | no. | 2.50 |
L1ZO | Slab Curing Bit | rft | 2.50 |
L1ZP | Tank (House) Cleaning | sft | 2.50 |
L1ZQ | Toilet Slab Setting | no. | 70.00 |
L1ZR | Labor Shed Shifting | sft | 14.00 |
L1ZS | Brick Soiling removal | sft | 4.50 |
L1ZT | Road Cutting by mqchine | rft | 10.00 |
L1ZU | Re-bar Carrying-150ft | kg | 2.50 |
L1ZV | Sand screening1 | cft | 3.00 |
L1ZW | Pile Head finishing-PIT | no. | 70.00 |
L1ZX | Sub-base removal | cft | 13.00 |
L1ZY | Wire Mesh Fixing in Wall | sft | 5.25 |
L1ZZ | MS Ver/Windw Grill Fixing | sft | 10.50 |