Return Main Menu

ITEM RATE
Click on Code to see the Shedule Items or Go Home
L1 Labour-Civil
Code Item Unit Rate(Tk.)
L101 Earth Work in Excavation cft
12.00
L102 Filling cft
6.00
L103 Brck flat soling sft
5.00
L104 Polythene laying sft
0.25
L105 Dismantling RCC cft
100.00
L106 CC (50mm) With NCF sft
16.00
L107 CC Work cft
35.00
L108 Brick Work-125mm sft
20.00
L109 Plaster Work sft
18.00
L110 Neat Cement Finishing sft
7.00
L111 RCC Work-Substructure cft
40.00
L112 150mm dia RCC Pipe rft
25.00
L113 Form work-Substructure sft
40.00
L114 Dismantling - PC Block sft
2.00
L115 Dismantle B/W 125 mm thk sft
4.00
L116 Dismatle - B/W cft
5.00
L117 Toilet Cubical fitting sft
20.00
L118 Dismantling board,ceiling sft
5.00
L119 Dismantle B/W 250mm thk cft
35.00
L120 Dismantle, Door Window sft
3.00
L121 Brick work-125mm Superstr sft
13.00
L122 250mm Brick work-Substruc cft
40.00
L123 Dismantle CI Sheet sft
3.00
L124 Dismantle Existing Store sft
9.50
L125 Pile Boring -500mm rft
90.00
L126 Pile casting cft
8.00
L127 Pile Form Work sft
8.00
L128 Pile shifting, driving rft
143.00
L129 Re-bar work-Substructure kg
8.00
L130 Skilled Labour no
800.00
L131 Unskilled Labour no
600.00
L132 Filling.loading,unloading bag
3.00
L133 Staging unloading LS
500.00
L134 Pile head cutting rod no.
200.00
L135 Dismantling RCC Pile head cft
70.00
L136 Re-bar welding LS
200.00
L137 Dismantling of plinth pro sft
12.00
L138 Dismantling of Tiles sft
10.00
L139 Shutter replace no
500.00
L140 Dismantling beam(.3x.3) no
1000.00
L141 Stage making No
1650.00
L142 RCC Dismantling sft
15.00
L143 Rod welded no
100.00
L144 Rubbish cleaning cft
5.00
L145 Rubbish remove no
100.00
L146 Back filling with compact cft
2.00
L147 Pre-cast block fitting no
100.00
L148 Co-Slab fixing at ins-pit no
150.00
L149 Dismantling CC-BFS sft
3.00
L150 Earth -Cutting pile cap Cft
8.00
L151 RCC work Super-structure cft
40.00
L152 Form work Super-structure sft
35.00
L153 Form work beam sft
16.00
L154 Removal Shutter sft
2.00
L155 Re-bar work Superstructur kg
8.50
L156 DPC work sft
5.00
L157 Clay soil remove cft
1.50
L158 Distle. CI sheet roofing. sft
11.50
L159 T-Ceiling remove/Refittin sft
11.50
L160 Sub-base cft
4.00
L161 Brick cleaning no
0.60
L162 Expension joint rft
3.00
L163 Shuttering -Wall sft
6.00
L164 Kerb making & fitting no
50.00
L165 Paving Tiles sft
20.00
L166 225mm dia RCC pipe rft
50.00
L167 300mm dia RCC pipe rft
75.00
L168 450mm dia RCC pipe rft
100.00
L169 600mm dia RCC pipe rft
125.00
L170 RMC-Mat cft
10.00
L171 Plaster with NCF sft
4.00
L172 Patent stone with NCF sft
25.00
L173 Bitumen painting sft
2.00
L174 HCI grating fixing no
800.00
L175 Dismantling BFS, HBB sft
5.00
L176 BFS with Morter joint sft
1.50
L177 75mm CC block no
35.00
L178 250mm B/Wall-Superstructu cft
45.00
L179 Plaster Superstructure sft
8.00
L180 Plaster O-A SFM sft
6.00
L181 RMC-Column/ Wall cft
35.00
L182 LC Dismantling sft
25.00
L183 Mason no.
800.00
L184 Site cleaning sft
2.00
L185 Labour for E/Cutting no
120.00
L186 Ext. Structure remove L.s
1750.00
L187 B-Chips Making 3/4" cft
3.75
L188 Labour for Sccafolding no
150.00
L189 Supply of Labour no
300.00
L190 Labour Sarder no
0.00
L191 O.T Labour hrs
0.00
L192 L-Carrying Sand L.s
0.00
L193 Brick bats breaking Truc
0.00
L194 Roller Hire Charge days
0.00
L195 Dismantle of Rcc R-kerb rft
50.00
L196 RCC Work in 6th floor cft
8.00
L197 Fixing MS Window/ Grill sft
15.00
L198 Fixing Cooaspible Gate sft
50.00
L199 Fitting Door Shutter sft
35.00
L1A0 RMC-Slab cft
30.00
L1A1 Fitting Door Frame rft
25.00
L1A2 Fitting Plastic Door no.
500.00
L1A3 RCC os MS Slab cft
35.00
L1A4 Re-bar Fabrication kg
8.50
L1A5 Plaster Outside sft
18.00
L1A6 Brick chips making- no.
1.00
L1A7 Pointing Brick Work cft
75.00
L1A8 Pointing Work sft
45.00
L1A9 Dowel Bar kg
10.00
L1AA Earthing Rod setting no.
15.00
L1AB Patent Stone Casting-Fini sft
12.00
L1AC Dismatle CC-75mm sft
32.50
L1AD Painting-Inside sft
8.00
L1AE Paiting-Outside sft
5.00
L1AF Door Shutter-Painting,Fix no.
2800.00
L1AG Safety Net Fixing sft
5.00
L1B0 Steel Shuttering-Slab sft
35.00
L1B1 Soil Stabilization cft
25.00
L1B2 RCC in Column/ Duct/ Lint cft
25.00
L1B3 Pile Head Breaking cft
120.00
L1B4 Making, fixing fan hook no.
100.00
L1B5 125mm Brickwork with Poin sft
25.00
L1B6 250 Ceramic Brick Work cft
45.00
L1B7 Conduit Laying-16mm rft
3.50
L1B8 Conduit Laying-20mm rft
4.50
L1B9 Filling 1000 cft cft
5000.00
L1C0 RMC-Stair cft
45.00
L1C1 Site Cleaning 1000sft each
2000.00
L1C2 Dismantle CC/ Lime Concre cft
35.00
L1C3 Dismantle Brick Work cft
25.00
L1C4 Extra for250mm Brick Work cft
8.00
L1C5 125mm Brick Work sft
9.00
L1C6 Extra for 125mm B/W super sft
3.00
L1C7 Extra for 250 Ceramic B/w cft
10.00
L1C8 Extra for Plaster-Super sft
4.00
L1C9 Form work-TB/Lintel sft
14.00
L1D0 Steel Shuttering-Mat sft
20.00
L1D1 Formwork-Floor/ Roof Slab sft
14.00
L1D2 Granite Fitting sft
110.00
L1D3 Door Lock Fitting no.
300.00
L1D4 Unskilled Labour1 no.
250.00
L1D5 Hardonite Floor sft
12.00
L1D6 Expansion Joint making rft
25.00
L1D7 MS Sliding Door fixing sft
25.00
L1D8 Road, Boundary Wall Disma no.
99999.99
L1D9 Tree Cutting no.
50000.00
L1E0 Steel Shuttering-BaseWall sft
35.00
L1E1 MS Door Fitting sft
35.00
L1E2 RCC in PC Slab-87mm sft
7.00
L1E3 PC Slab Shuttering sft
13.00
L1E4 Cast-in-situ Slab sft
10.00
L1E5 Extra earth 0.5m exc 1.5m cft
5.00
L1E6 Glass wall fixing sft
100.00
L1E7 Brick Bond Concrete sft
25.00
L1E8 Facing Brickwork sft
90.00
L1E9 uPVC Dooor frame fixing rft
30.00
L1F0 Steel Shuttering-LiftWall sft
35.00
L1F1 uPVC Door Shutter fitting no.
100.00
L1F2 Sand-Khoa Filling cft
6.00
L1F3 Erection of PC slab sft
6.00
L1F4 PVC Water Bar fitting rft
20.00
L1F5 Drip Course1 rft
20.00
L1F6 Non-shrink grout, shuttte cft
100.00
L1F7 MS Gate Fixing sft
10.00
L1F8 Stripping of Damaged Bric sft
15.00
L1F9 Earth work in Box cutting cft
8.00
L1G0 Steel Shuttering-Stair sft
30.00
L1G1 HBB sft
10.00
L1G2 Honecomb Brick Work cft
15.00
L1G3 Making, Filling Bats cft
15.00
L1G4 Sub-base Work/Gravel fiil cft
20.00
L1G5 Uni-paving Blocl Laying sft
30.00
L1G6 Kerb-stone fixing rft
50.00
L1G7 Excavation with Excavator cft
6.00
L1G8 Soil Disposal cft
8.00
L1G9 125mm Poiting Brick Work sft
45.00
L1H0 RCC-Sunshade cft
35.00
L1H1 Clean, Dispose Debris cft
5.00
L1H2 Bollah Driving (12 ft) no.
500.00
L1H3 Fixing Drum Sheet no.
60.00
L1H4 Layout with Materials sft
0.00
L1H5 Facing Brick Clading sft
40.00
L1H6 75mm Brick Work sft
10.00
L1H7 Coarse Plastering-outside sft
10.00
L1H8 Chipping RCC Surface sft
10.00
L1H9 25x6 Groove making rft
50.00
L1J1 Fixing Rolling Shutter nos.
5000.00
L1J2 Removing HBB sft
3.00
L1J3 Epoxy Grout Apply cft
1000.00
L1J4 Ladder Rung make,fix no.
300.00
L1J5 RCC Pipe-100mm dia rft
30.00
L1J6 RCC Pipe-1000mm dia fitti rft
200.00
L1J7 RCC Pipe-1200mm dia fit rft
250.00
L1J8 Levelling, Dressing sft
1.00
L1J9 Place prxast block-300x60 no.
20.00
L1K1 Grating Fixing sft
20.00
L1K2 Precast Tile Laying sft
5.00
L1K3 B-Chips making-.75" No.
2.00
L1K4 450mm Pile boring rft.
150.00
L1K5 Grinding for Integrity te no.
150.00
L1K6 Preparation for Load Test no.
25000.00
L1K7 Ready Mix Concrete-CC cft
30.00
L1K8 Ready Mix Concrete-Base cft
35.00
L1K9 Ready Mix Concrete-Wall cft
20.00
L1L1 Shuttering - Base sft
35.00
L1L2 Shuttering-Wall sft
37.00
L1L3 Tie Rod Cutting n Reparin no.
50.00
L1L4 Shuttering in OverheDrain sft
40.00
L1L5 Water Stopper Fixing rft
7.00
L1L6 CC Work (3"/4") Sft
6.00
L1L7 Leveling and Dresing sft
5.00
L1L8 Sand Filling Cft
4.00
L1L9 Brick Soling Sft
4.00
L1M0 Material Carrying by Tru1 Sft
630.00
L1M1 Material Carrying by Tru2 Truc
600.00
L1M2 Materials Carrying by Tru Truc
650.00
L1M3 Materials Carrying by Lab Nos.
250.00
L1M4 Polymer Membrane laying sft
5.00
L1M5 Waterproof painting sft
5.00
L1M6 Sealant applying rft
15.00
L1M7 Epoxy Bonding Applying sft
20.00
L1M8 Ceramic Tile Cladding sft
60.00
L1M9 Roof Tiles Terracing sft
100.00
L1N1 Form Work (Upto G.B- Sup. Sft
38.00
L1N2 CC Casting (3") Sft.
5.00
L1N3 Form Work (1st Floor) Sft.
38.00
L1N4 RCC Work (1st Floor) Cft.
22.00
L1N5 Re-bar work (1st Floor) Kg.
4.50
L1N6 Shutter Rent with Carryin Sft.
20.00
L1N7 Cement unload, carrying bags
11.00
L1N8 Rod unload, carrying Ton
600.00
L1N9 Miscellanceous bill LS
1.00
L1O0 Rod Unload Ton
250.00
L1O1 Rod Carrying Ton
400.00
L1O2 Door Frame Fixing no.
500.00
L1O3 Door Shutter fixing no.
600.00
L1O4 Hatch bolt fitting no.
70.00
L1O5 Door Shutter Polish sft
50.00
L1O6 Door Frame Polish rft
110.00
L1O7 DoorViwer Panel-600x450-5 no.
1800.00
L1O8 250mm B/Wall -1st Floor Cft.
11.55
L1O9 Shingle-Sand Compaction cft
14.25
L1P1 Shingles Washing and Carr cft
10.00
L1P2 Fixing Stair/ Ver Railing sft
20.00
L1P3 125mm Brick wall-1st Floo Sft
9.45
L1P4 Plaster work-1st Floor Sft
8.92
L1P5 250mm Brick wall-2nd Floo Cft
12.10
L1P6 125mm Brick wall-2nd Floo Sft
9.90
L1P7 Plaster work-2nd Floor Sft
9.35
L1P8 RCC Work -2nd Floor Cft
24.20
L1P9 Form Work-2nd Floor Sft
41.80
L1Q1 Re-bar work -2nd Floor Kg
4.95
L1Q2 RCC Surface Chipping sft
4.00
L1Q3 Staging for Shutter Wo Sft
2.00
L1Q4 Wooden Door Fitting Nos.
250.00
L1Q5 Excavator Hire Charge hrs.
0.00
L1Q6 Demolition-Bituminous Rd sft
50.00
L1Q7 Demolition-Steel Structur sft
10.00
L1Q8 Bamboo-CI Sheet Fencing rft
100.00
L1Q9 Dismatle Plaster sft
10.00
L1R1 Outer Walll Tile Clading sft
35.00
L1R2 CC Work1 sft
10.00
L1R3 Power Trowel Finishing sft
3.00
L1R4 Lime Terracing cft
60.00
L1R5 Readymix Concrete-Slab cft
20.00
L1R6 Earth Carrying-60-100m cft
3.00
L1R7 Earth Carrying-100-200m cft
6.00
L1R8 Earth Carrying -200-300m cft
9.00
L1S0 Earth Carrying-300m+ cft
12.00
L1S1 Groove making in Plaster rft
15.00
L1S2 Gwo Textile Laying sft
10.00
L1S3 CC Work (6"/8" Thick) Cft.
22.00
L1S4 Earth/Backfilling work cft
4.00
L1S5 RCC Work -Mixer m/c cft
21.00
L1S6 RCC Work (In Pond) cft
26.00
L1S7 Formwork (upside) sft
24.00
L1S8 Formwork (In Pond) sft
40.00
L1S9 MS Rebar Fabrication kg
5.50
L1T0 Layout LS
5000.00
L1T1 CC/RCC Carrying cft
5.00
L1T2 MS Rebar Carrying ton
250.00
L1T3 Labour Fooding Charge no.
100.00
L1T4 Excavator/Vaco Hire Charg day
10000.00
L1T5 Extra Earth Cutting cft
5.00
L1T6 Sub-Base Laying Sft
15.00
L1T7 CC/RCC Carrying1 cft
3.00
L1T8 Staging work in Pond sft
12.00
L1T9 CC/RCC Carrying2 cft
4.00
L1U0 CC (6"/8" Thick) Floor cft
18.00
L1U1 NCF with Power Trowel sft
20.00
L1U2 Cement Unloading bags
5.00
L1U3 Core Drilling-75mm no.
500.00
L1U4 Mesh Plastering sft
20.00
L1U5 Shear Connector-8~12 no.
90.00
L1U6 Anchor Grout-10~12 no.
80.00
L1U7 Anchor Grout-12~14 no.
100.00
L1U8 Anchor Grout-16~18 no.
120.00
L1U9 Bondibg Epoxy Application sft
50.00
L1V0 Readymix Concrete-Labour cft
20.00
L1V1 Road Shutter Fixing sft
10.00
L1V2 125mm Brickwork1 sft
8.00
L1V3 Formwork (PL to GF Slab) sft
27.00
L1V4 RCC Work (PL to GF Slab) cft
23.00
L1V5 Inside Carrying by Truck nos.
350.00
L1V6 Concreting in Block cft
8.00
L1V7 Loading and Unloading Blo cft
11.90
L1V8 Laying Block cft
41.65
L1V9 Cutting-Fixing Cork sheet sft
2.00
L1W0 Levelling Dressing sft
3.80
L1W1 Earth Excavation Cft
5.50
L1W2 Mud Removal Cft
5.00
L1W3 Excavator Charge LS
4000.00
L1W4 Deduction Labor LS
-7500.00
L1W5 Non-shrink grout aplying cft
500.00
L1W6 Soil Removal by Truck Truc
1500.00
L1W7 Cork-sheet fixing sft
5.00
L1W8 Hollow Block-10mm sft
30.00
L1W9 Exacavat upto 3m 6m lead cft
7.50
L1X0 Exacavat 3-6m, 6m lead cft
9.50
L1X1 Expansion Joint making-fi rft
100.00
L1X2 Gap Filling Shore Pile sft
175.00
L1X3 Formwork-Block sft
5.00
L1X4 Hollow Block-390x90x190 cft
71.35
L1X5 Hollow Block-390X190X190 CFT
47.75
L1X6 Palasiding-1050x600, 3m rft
30.00
L1X7 Excavator Rent-Cat-5 hour
729.12
L1X8 Excavator Carrying trip
9000.00
L1X9 Brick-chips making-2 no.
0.60
L1Y0 Excavator Rent-Cat-7 hour
916.66
L1Y1 Excavator Carrying-2 trip
10000.00
L1Y2 Block-500x500x500-Dumping no.
6.00
L1Y3 Block-500x500x500-Laying no.
60.00
L1Y4 Block-400x400x400-Dumping no.
3.15
L1Y5 Block-400x400x400-Laying no.
16.50
L1Y7 Block-450x450x300-Dumping no.
4.50
L1Y8 Block-450x450x300-Laying no.
20.00
L1Y9 Orinary Labour-1 no.
600.00
L1Z0 High Yield re-bar fabrica kg
20.00
L1Z1 PSC-Girder-Deck Slab cft
70.00
L1Z2 H.T. Strand Fabrication kg
20.00
L1Z3 Head Mason no.
1000.00
L1Z4 Foreman no.
1000.00
L1Z5 Electrician no.
800.00
L1Z6 Technician no.
1200.00
L1Z7 Barbed Wire Fencing-Singl rft
10.00
L1Z8 Boundary-MS Angle Work kg
12.00
L1Z9 Mechanical Compaction cft
4.00
L1ZA Readymix-Head Load cft
15.00
L1ZB Shuttering-Wood sft
25.50
L1ZC Re-bar Work i/c GI Wire kg
8.00
L1ZD Bailing out of Water-1 hour
120.00
L1ZE Tin Shed making sft
15.00
L1ZF Readymix with Pump cft
8.00
L1ZG Steel Shuttering dft
31.00
L1ZH Shutter Clean with Cupbru sft
2.25
L1ZI Steel Shutter Oiling sft
1.50
L1ZK Scaffolding-4ft sft
7.00
L1ZL Chipping Work sft
3.00
L1ZM CC Block-0.75-1.5 inch no.
0.65
L1ZN CC Block-1.5-3.0inch no.
2.50
L1ZO Slab Curing Bit rft
2.50
L1ZP Tank (House) Cleaning sft
2.50
L1ZQ Toilet Slab Setting no.
70.00
L1ZR Labor Shed Shifting sft
14.00
L1ZS Brick Soiling removal sft
4.50
L1ZT Road Cutting by mqchine rft
10.00
L1ZU Re-bar Carrying-150ft kg
2.50
L1ZV Sand screening1 cft
3.00
L1ZW Pile Head finishing-PIT no.
70.00
L1ZX Sub-base removal cft
13.00
L1ZY Wire Mesh Fixing in Wall sft
5.25
L1ZZ MS Ver/Windw Grill Fixing sft
10.50