ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
L0 | Labour - Civil | ||
Code | Item | Unit | Rate(Tk.) |
L000 | Form work Foot-col-Str | sft | 6.00 |
L001 | Re-bar Work | kg | 8.00 |
L002 | Formwork upto 10ft from P | sft | 23.00 |
L003 | Form work:14ft from PL | sft | 6.25 |
L004 | Ordinary Labour Supply | nos. | 350.00 |
L005 | Head Mason Supply | nos. | 500.00 |
L006 | O.T. (5 hr.) - Labour | nos. | 50.00 |
L007 | O.T. (5 hr.) Mason | nos. | 100.00 |
L008 | Dismentling F/W/Mar tile | sft | 15.00 |
L009 | Sand Screening | cft | 1.00 |
L00A | Skilled Labour-1 | No | 300.00 |
L00B | Helper-1 | No | 350.00 |
L00C | Mason-1 | no | 450.00 |
L00D | Brick carrying T-park-TFD | no | 0.00 |
L00E | Rough plaster | sft | 2.00 |
L00F | CC casting | cft | 5.00 |
L00G | 10" C-10 hole b/work | cft | 20.00 |
L00H | C-b-wall pointing | sft | 3.00 |
L00I | C-brick cladding | sft | 25.00 |
L00J | BFS with Morter joint. | sft | 5.00 |
L00K | CC Block fixing | sft | 20.00 |
L00L | CC Block remove | sft | 10.00 |
L00M | 10" ceramic brick work | cft | 0.00 |
L00N | Khadri | sft | 25.00 |
L00O | Cobla door-Win side | sft | 15.00 |
L00P | Earth cutting | cft | 0.00 |
L00Q | Shutter opening | sft | 0.00 |
L00R | 250mm b-work-30.5ft | cft | 0.00 |
L00S | 250mm b-work-44.5ft | cft | 0.00 |
L00T | 250mm b-work-72.5ft | cft | 0.00 |
L00U | 125mm b-work-44.5ft | sft | 0.00 |
L00V | 125mm b-work-58.5ft | sft | 0.00 |
L00W | 125mm b-work-72.5ft | sft | 0.00 |
L00X | Ceiling plaster-16.5ft | sft | 0.00 |
L00Y | Ceiling plaster-72.5ft | sft | 0.00 |
L010 | Bitumen Paint | sft | 1.00 |
L011 | Carpenter Helper | nos. | 150.00 |
L012 | RCC Casting-Superstructur | sft | 10.00 |
L013 | Neat Cement Finishing1 | sft | 3.00 |
L014 | Local carrying Rod | kg | 0.40 |
L015 | Carpenter Supply | nos. | 500.00 |
L016 | RCC Casting. | cft | 26.00 |
L017 | Formwork above 18 ft | sft | 6.50 |
L018 | 250mm Brickwork upto 7 ft | cft | 4.25 |
L019 | B/w :8.5-14ft Scaffold Ht | cft | 5.25 |
L020 | B/w:15.5-27ft Scffld(Part | cft | 6.00 |
L021 | FormWork:45-57ft from PL | sft | 0.00 |
L022 | Poitning:8.5-14ft Scaffol | sft | 0.90 |
L023 | Poiting:15.5-27ft Scaffol | sft | 1.00 |
L024 | FormWork:31-45ft from PL | sft | 6.00 |
L025 | FormWork:24-33ft from PL | sft | 10.00 |
L026 | Ceramic B/W+pointing | sft | 15.00 |
L027 | D.P.C. | sft | 3.00 |
L028 | 125mm thick Brick Work | sft | 6.00 |
L029 | B/W:15.5-27ft Scaffold Ht | cft | 12.00 |
L030 | Pointing:15.5-27ft Saffld | sft | 2.00 |
L031 | Shuttering:27ft+Scaffold | sft | 11.00 |
L032 | InPlaster upto 16ft | sft | 0.00 |
L033 | InPlaster 30.5ft | sft | 0.00 |
L034 | InPlaster 44.5ft | sft | 4.00 |
L035 | OutPlaster upto 16.5ft | sft | 0.00 |
L036 | OutPlaster 30.5ft | sft | 4.50 |
L037 | OutPlaster 15.5-28ft | sft | 5.00 |
L038 | Formwork 33-41 ft | sft | 0.00 |
L039 | B/w 1st Flr 14-22.5ft | cft | 0.00 |
L040 | 5" B/w 1st Flr 14-22.5ft | sft | 0.00 |
L041 | InPlaster1st Flr14-22.5ft | sft | 0.00 |
L042 | FinColmn Plaster upto41ft | rft | 0.00 |
L043 | Form work B/Slab 3rdflr | sft | 0.00 |
L044 | Design Plaster 33-42.5ft | rft | 0.00 |
L045 | InPlaster 3rd Flr 33-42ft | sft | 0.00 |
L046 | Drip Course/Sill bit | rft | 0.00 |
L047 | B/w 2nd Flr 23-33ft | cft | 0.00 |
L048 | 5" B/w 2nd Flr 23-33ft | sft | 0.00 |
L049 | InPlaster 2nd Flr 23-33ft | sft | 6.00 |
L050 | Welder Supply | no. | 0.00 |
L051 | Rcc S-Casting slop | cft | 10.00 |
L052 | Steel Shutter Opening | sft | 0.00 |
L053 | Ceramic Brick Cladding | sft | 0.00 |
L054 | Form work slop 24-33ft | sft | 10.00 |
L055 | A-Gate Duco paint | sft | 40.00 |
L056 | Brick-chips making 3/4" | cft | 0.00 |
L057 | Brick-chips making 1 1/2" | no. | 0.33 |
L058 | Louver Plaster(Cut,Cast) | rft | 0.00 |
L059 | Mason Supply | no. | 0.00 |
L060 | RCC Casting-Substructure | cft | 6.00 |
L061 | RCC Casting-2nd Flr Slb | cft | 0.00 |
L062 | Form Work Fitting-SubStr | sft | 0.00 |
L063 | Brickwork upto 58.5 ft | cft | 0.00 |
L064 | Old Brick Cleaning | nos. | 0.00 |
L065 | Welding surface cleaning | no | 10.00 |
L066 | Flush pointing (1:2) | sft | 3.00 |
L068 | Barbed wire fencing | sft | 25.00 |
L069 | Formwork Col-2nd Floor | sft | 0.00 |
L070 | From slab-2nd flr-Fix | sft | 0.00 |
L071 | Brick-Chips(1.5") making | cft | 1.74 |
L072 | MS Angle work | kg | 12.00 |
L073 | Cer Brk Clading-Round Slb | sft | 0.00 |
L074 | Pile driving (250x250mm) | rft | 50.00 |
L077 | E/Cutting | cft | 2.00 |
L078 | Sand filling1 | cft | 1.00 |
L079 | Rod binder supply | no. | 0.00 |
L080 | Enamel paint-Boundary | sft | 5.00 |
L081 | Ceramic 10-Hole B/W | sft | 10.00 |
L082 | R.C.C casting 1st floor | cft | 0.00 |
L083 | Only shutter oppening | sft | 0.00 |
L084 | Form work parapet wall | sft | 0.00 |
L085 | Form work 1st floor | sft | 0.00 |
L086 | 250mm B/work-23ft-ht | cft | 0.00 |
L087 | 125mm B/work-45ft-ht | sft | 0.00 |
L088 | 250mm B/work-45ft-ht | cft | 0.00 |
L089 | 125mm B/work-23ft | sft | 0.00 |
L090 | Ceiling plaster-30.5ft-ht | sft | 0.00 |
L091 | In-side plaster-58.5ft-ht | sft | 0.00 |
L092 | Outside plaster-44.5ft-ht | sft | 0.00 |
L093 | Ceiling plaster-44.5ft-ht | sft | 0.00 |
L094 | Inside plaster-72.5ft-ht | sft | 0.00 |
L095 | Outside plaster-58.5ft-ht | sft | 0.00 |
L096 | Ceiling plaster-58.5ft-ht | sft | 0.00 |
L097 | Inside plaster-33ft-ht | sft | 0.00 |
L098 | Outside plaster-72.5ft-ht | sft | 0.00 |
L099 | Design plaster-24ft-ht | rft | 0.00 |
L0A0 | Ordinary Labour (Rev) | nos. | 0.00 |
L0A1 | 250mm brickwork-16.5ft | cft | 0.00 |
L0A2 | 125 brick work-16.5ft | sft | 0.00 |
L0A3 | 125mm brickwork-30.5ft | sft | 0.00 |
L0A4 | Rough Pointing | sft | 0.00 |
L0A5 | Design Cobla | rft | 0.00 |
L0A6 | Drip Course | rft | 0.00 |
L0A7 | Rod Binder supply1 | No | 0.00 |
L0A8 | Rod Binder Helper supply | No | 0.00 |
L0B1 | 250mm B/W (13.5ft) | cft | 0.00 |
L0B2 | 250mm B/W (23.5ft) | cft | 0.00 |
L0B3 | 250mm B/W (33.5ft) | cft | 0.00 |
L0B4 | 125mm B/W (13.5ft) | sft | 0.00 |
L0B5 | 125mm B/W (23.5ft) | sft | 0.00 |
L0B6 | Inside Plaster (13.5ft) | sft | 0.00 |
L0B7 | Ceiling Plaster (13.5ft) | sft | 0.00 |
L0B8 | D/W Cobla Plaster | sft | 0.00 |
L0B9 | Ceiling Plaster(19ft) | sft | 0.00 |
L0C0 | Ceiling Plaster 13.5ft | sft | 0.00 |
L0C1 | Drip Course making | rft | 0.00 |
L0C2 | Plaster inside-19.5ft | sft | 0.00 |
L0C3 | Inside Plaster (23.5ft) | sft | 0.00 |
L0C4 | Inside Plaster (33.5ft) | sft | 0.00 |
L0C5 | Inside Plaster (43.5ft) | sft | 0.00 |
L0C6 | Outside Plaster (13.5ft) | sft | 0.00 |
L0C7 | Outside Plaster (23.5ft) | sft | 0.00 |
L0C8 | Outside Plaster (33.5ft) | sft | 0.00 |
L0C9 | Outside Plaster (43.5ft) | sft | 0.00 |
L0D0 | Ceiling Plaster (23.5ft) | sft | 0.00 |
L0D1 | Design Cobla Plaster | rft | 0.00 |
L0D2 | 250mm B/W (43.5ft) | cft | 0.00 |
L0D3 | 125mm B/W (33.5ft) | sft | 0.00 |
L0D4 | Form Work upto 18ft | sft | 0.00 |
L0D5 | Forkwork (part rate) | sft | 0.00 |
L0D6 | Staging for Long height | sft | 0.00 |
L0D7 | Formwork upto 31ft | sft | 0.00 |
L0D8 | Formwork-Substructure | sft | 0.00 |
L0D9 | Shutter making | sft | 0.00 |
L0E0 | Drain Cobla Plaster | sft | 0.00 |
L0E1 | Cobla Neat Cement Finish | sft | 0.00 |
L0E2 | Rebar Carrying | kg | 0.35 |
L0X | Ceiling Plaster 10ft | sft | 0.00 |
L0X2 | 125mm b-work 22.5ft | sft | 0.00 |
L0X3 | Plaster work 22.5ft | sft | 0.00 |
L0X4 | Plasterwork-10ft | sft | 0.00 |
L0X5 | Formwork upto-38ft | sft | 0.00 |
L0Z | Paty Tiles at roof | sft | 0.00 |
L0Z0 | 125mm brick work-10ft | sft | 0.00 |
L0Z1 | Ridge fittings | rft | 0.00 |
L0Z2 | Turfing work | sft | 0.00 |
L0Z3 | Formwork 28ft | sft | 0.00 |
L0Z4 | Shutter making with wood | sft | 0.00 |
L0Z5 | Staging at Cantilever | sft | 0.00 |
L0Z6 | 250mm B/W (18ft) | cft | 0.00 |
L0Z7 | 250mm Brickwork (28ft) | cft | 0.00 |
L0Z8 | Formwork 46.83ft | sft | 0.00 |
L0Z9 | Form work upto 26.25ft | sft | 0.00 |