ITEM RATE | |||
---|---|---|---|
Click on Code to see the Shedule Items or Go Home | |||
A6 | Mobilization-Demobil | ||
Code | Item | Unit | Rate(Tk.) |
A601 | Trailer for demobilizatn | trip | 3000.00 |
A602 | Crane for Loading | day | 5000.00 |
A603 | Labour for Loading-Rigman | nos | 120.00 |
A604 | Crane for Unloading | day | 5000.00 |
A605 | Labour for Unload-Rigman | nos | 120.00 |
A606 | Dismantling(15nosx10day) | mday | 120.00 |
A607 | Survey,Drg study Engr/Ar | day | 1800.00 |
A608 | Inventory Listing | day | 800.00 |
A609 | Autocad Operator | day | 800.00 |
A610 | Checking by Arc/Engr | day | 2333.33 |
A611 | Sundries-As-built drawing | LS | 493.33 |