BREAKDOWN OF UNIT PRICE
Item: (F009A) 1000mm dia RCC Pipe
Basis:1 rft
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
15.000
no.
15.00
225.00
Sand - Local
1.800
cft
35.00
63.00
Cement
1.000
bag
535.00
535.00
Brick-chips-20mm
3.500
cft
175.00
612.50
Sub-Total(A1)
1435.50
4709.88
E1.Equipment-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mixer m/c and vibrator
6.000
cft
4.00
24.00
Excavator
0.005
day
10000.00
50.00
Sub-Total(E1)
74.00
242.79
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brck flat soling
5.000
sft
5.00
25.00
CC Work
6.000
cft
35.00
210.00
RCC Pipe-1000mm dia fitti
1.000
rft
200.00
200.00
Sub-Total(L1)
435.00
1427.24
Total(1)
6379.90
Add over head on Total(1)
5.0 %
319.00
Total(2)
6698.90
Add Profit on Total(2)
10.0 %
669.89
Total(3)
7368.79
Add VAT on Unit Price
5.5 %
452.83
Add Income Tax on Unit Price
5.0 %
411.66
Unit Price
8233.28
Say
8233
per RM