BREAKDOWN OF UNIT PRICE
Item: (F009) 600mm dia Rcc pipe (Capital-RC)
Basis:1 rft
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
8.000
no.
15.00
120.00
Sand - Local
0.900
cft
35.00
31.50
Polythene
0.160
kg
105.00
16.80
Cement
0.500
bag
535.00
267.50
Brick-chips-20mm
1.800
cft
175.00
315.00
Sub-Total(A1)
750.80
2463.37
E1.Equipment-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mixer m/c and vibrator
3.100
cft
4.00
12.40
Sub-Total(E1)
12.40
40.68
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Earth Work in Excavation
6.350
cft
12.00
76.20
Brck flat soling
2.670
sft
5.00
13.35
CC Work
3.100
cft
35.00
108.50
600mm dia RCC pipe
1.000
rft
125.00
125.00
Sub-Total(L1)
323.05
1059.93
Total(1)
3563.99
Add over head on Total(1)
5.0 %
178.20
Total(2)
3742.19
Add Profit on Total(2)
10.0 %
374.22
Total(3)
4116.40
Add VAT on Unit Price
5.5 %
252.96
Add Income Tax on Unit Price
5.0 %
229.97
Unit Price
4599.33
Say
4599
per RM