BREAKDOWN OF UNIT PRICE
Item: (F004) 600 mm dia Rcc pipe (Capital)
Basis:1 rft
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Brick
8.000
no.
15.00
120.00
Sand - Local
0.120
cft
35.00
4.20
Cement
0.060
bag
535.00
32.10
Brick-chips-20mm
0.220
cft
175.00
38.50
Sub-Total(A1)
194.80
639.14
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Earth Work in Excavation
7.067
cft
12.00
84.80
Brck flat soling
2.670
sft
5.00
13.35
CC Work
0.400
cft
35.00
14.00
600mm dia RCC pipe
1.000
rft
125.00
125.00
Sub-Total(L1)
237.15
778.10
Total(1)
1417.24
Add over head on Total(1)
5.0 %
70.86
Total(2)
1488.10
Add Profit on Total(2)
10.0 %
148.81
Total(3)
1636.91
Add VAT on Unit Price
5.5 %
100.59
Add Income Tax on Unit Price
5.0 %
91.45
Unit Price
1828.95
Say
1829
per RM